Mes compétences :
Gestion de projet
Travail en équipe
Commissioning

Entreprises

  • Emerson Process Management - Project engineer

    BRON 1999 - maintenant Projects Handled

    14+ Years at Emerson Process Management, Systems Division.
    • Study and realisation of the projects according to the Customer Requirements.
    • Responsibility of projects, coordination of the actions of the different Emerson partners (between India, Russia and France).
    • Overall Technical Leader during commissioning phase for 1 year in Korea.
    • Site Assistance of manufacture unit.
    • CLOV FPSO project Engineering Manager in Emerson Asia Pacific office located in Singapore for 2 years.

    Main Realisations:
    - Since October 2010 CLOV FPSO project Engineering Manager in Singapore for project with TOTAL E&P Angola, coordinatingTopsides/Hull/Subsea teams.
    - Dec 2008-Mid 2010: ICSS Overall Technical Leader for the Kharyaga Project in Russia with TOTAL E&P Russia .
    Coordination between Emerson’s team located in Chelyabinsk (Russia), EPC in Chennai (India) and project management in Moscow.
    - October to Mid-November 2008 ICSS Lead Engineer TOTAL : Off shore site assistance during start up phase in Nigeria.
    - June to October 2008 ICSS Lead Engineer TOTAL : Overall Technical Leader of the commissioning team on the AKPO FPSO Project during towing phase from Korea to Singapore then from South Africa to Nigeria.
    - End 2007 to June 2008 ICSS Lead Engineer TOTAL : Overall Technical Leader of the commissioning team (average of 12 with peak up to 19 engineers) on the AKPO FPSO Project located at the Hyunday Heavy Industries yard in Ulsan, South Korea.
    I was in charge of Emerson’s team turnover, reporting, coordination meeting, scheduling of commissioning tasks with different package vendors...
    - 2005-2007 Projects Engineer TOTAL : Integrated in the team for the AKPO FPSO oil platform.
    Lead Engineer of the interface between the ICSS and the “third” party (package) of the project including the subsystem testing.
    Lead Engineer for the “Design Validation Test”, in particular for the “Subsea” part of the project.
    Lead Engineer for the Subsea part and coordination with Cameron company in Celle (Germany).
    Assigned also for coordination between hull, subsea and topside’s Emerson teams.
    - 2005 Projects Engineer TOTAL : Lead Engineer of the “Design Validation Test” for the AKPO FPSO oil platform regarding the design validation done during the "Basic Engineering".
    Also integrated in the team for the typicals definition.
    TOTAL : Severals periods of site assistance for an automation project of a gas extraction unit in IRAN.
    Others : Lead Engineer during a FAT for a project in IRAN.
    - 2003 Lead Engineer TOTAL : Realization of the "Basic Engineering" for the AKPO FPSO oil platform project, in particular regarding the interface between the ICSS and the “third” party of the project.
    - 2002-2003 Lead Engineer TOTALFINAELF : automation of an unit of extraction of gas in IRAN on a DeltaV system and coordination of the relation between India and France.
    - 2001 Systems Engineer SANOFI Synthélabo : Start up phase of a pharmaceutical unit on PROVOX system and the different phases PROVOX batch on a system DeltaV Batch via OPC.
    - 2000 Systems Engineer SANOFI Synthélabo : Automation of a pharmaceutical unit on PROVOX system and programming of the different phases PROVOX batch on a system DeltaV Batch via OPC.
    - 1999 Systems Engineer SNPE Toulouse : automation of a chemical unit on PROVOX system