Mes compétences :
Team Management
structural design
structural analysis
detailed design
Road Bridge Design
Prepared design
Microsoft Office
Construction methodology assistance
Civil Engineering
Autocad
Entreprises
Jacobs Engineering
- Senior Bridge Engineer
Pasadena2015 - maintenant
FREYSSINET AUSTRALIA
- Method & Design Engineer
2012 - 2014www.freyssinet.com.au
for permanent works
* Method Engineer for construction
* Participated to the following projects:
* Fern Street Bridge - Gerringong Upgrade, Australia ;
* Majura Parkway Bridge, Australia
* Windsor Bridge Replacement, Australia
* EastWest Link, Australia
* Homebush Bay bridge, Australia
Achievements
* Construction methodology assistance for incrementally launched bridges and balanced cantilever bridges
* Post-tensioning design assistance for incrementally launched bridges and balanced cantilever bridges
* Detailed design of the temporary works for incrementally launched bridges (launching nose, side guides) and balanced cantilever bridges (Form traveler)
* Preliminary design of a cable-stayed bridge with two independent decks and one pylon
* Design and construction methodology assistance for precast segmental erection
* Design of external post-tensioning strengthening ;
* Development of design tools for post-tensioning design
* Maintain the documentation database with technical papers on the construction fields ;
Systra
- Senior Bridge Design Engineer
Paris2010 - 2012* Cost studies and programs ;
* Participated to the following projects:
* Tours Tramway Line 1, France
* Panama City Metro Project, Panama
* Baghdad Metro Project, Iraq
* Mtkvari Bridge, Georgia
* Seohae Railway Bridge, South Korea
* WFSL Mumbai Project, India
* Toulouse Tramway Extension Project, France
Achievements
* Managed and performed strengthening detailed design with external post-tensioning
* Carried out the concept design review of a cable-stayed bridge
* Managed the conceptual design of an elevated metro project
* Carried out complex 3D finite element model analysis using Sofistik
* Designed with high seismic area requirements ;
* Carried out the preliminary design of a high speed railway cable-stayed bridge
* Performed design following different codes (Euronorm, Indian Standards, Korean Standards, Japanese Standards, AASHTO) ;
Systra
- Tender Coordination
Paris2010 - 2010* Participated to the following projects:
* Ho Chi Minh City Metro Line 1, Vietnam ;
* Advisor for GS E&C (Korean Contractor) for the tender phase
Achievements
* Coordinated the design of the elevated structures (17km of typical viaducts, 1 extradossed bridge, 4 balanced cantilever bridges, 11 elevated stations and 1 depot)
* Defined the construction methods for the viaduct, stations and foundations
* Designed following the Vietnamese and Japanese Standards ;
Systra
- Special Bridge Design Manager
Paris2009 - 2009* Manage a team of 4 engineers and 6 CAD drafters ;
* Participated to the following project:
* Al Mashaaer Al Mugaddassah Metro Project, Kingdom of Saudi Arabia
* Advisor for CRCC (China Railway Construction Corporation) during construction phase
Achievements
* Managed the detailed design of three balanced cantilever bridges and a three span continuous bridge erected on scaffolding
* Carried out the detailed design of a simply supported long span prestressed concrete box
* Performed the preliminary design of the typical viaduct
* Prepared design tools for calculation simplification ;
* Delivered the complete design in time from conceptual to detailed in less than 9 months ;
* Designed following the AASHTO Specifications ;
Systra
- Junior Bridge Design Engineer
Paris2007 - 2008charge of elevated metro project structural studies ;
* Mentor Engineer for interns in the bridge division
* Participated to the following projects:
* Dubai LRT, United Arab Emirates
* Mumbai MRTS Line 1, India
* Krasinski Bridge, Poland
* Hanoi Metro Line, Vietnam ; * Designed and prepared engineering designs, plans, drawings, and specifications for reinforced concrete, prestressed concrete and composite bridges
* Prepared conceptual design for elevated metro project including typical viaduct (simply supported deck), special bridge (balanced cantilever bridge, extradossed bridge) and stations
* Carried out design review on prestressed concrete deck, headstocks and piers for elevated metro project
* Used structural calculation software: Sofistik, Robot, ST1
* Performed design following different codes (Euronorm, Bristish Standards, Vietnamese codes, Indian Standards) ;