-
Al Hosn Gas - ADNOC Group (Abu Dhabi, UAE)
- Senior Environmental Engineer
2015 - 2017
Environmental support to Al Hosn Gas operations, drilling activities and projects; Implementation of an Environmental Management System as per ISO14001:2015; Air emission monitoring and reduction projects (CEMS, PEMS, LDAR, dispersion modeling); Resources, flaring, and waste minimization studies; Periodic internal and external environmental reporting and KPIs (monthly, quarterly, annually); Development of IT modules for environmental reporting and risk assessment; Environmental audits and awareness; Environmental impact assessment for new projects.
Al Hosn Gas is developing the sour gas reservoirs located in the Shah Field onshore of Abu Dhabi and is operating all the facilities to extract, transfer, process, produce, transport and deliver the sweet gas, liquid hydrocarbons and granulated sulphur.
-
Fanch Environmental Consultancy FZE (Dubai, UAE)
- Environmental Freelance Consultant
2014 - 2015
1. Set-up of a ‘Consulting and Service’ company in the UAE, providing services as a freelance environmental consultant for reputable, international consultancy companies in the Middle East (Five Oceans Environmental Services LLC, Trinity Environmental Consultancy International)
2. Preparation of Environmental Impact Assessment (EIA) studies
a. Writing of every section of the EIA report, including Project Description, Regulatory Framework, Baseline Assessment, Environmental Impacts and Mitigation
b. Participation in EIA studies in Oman, Qatar and the UAE for the following activities: onshore and offshore oil and gas exploration, petrol station, metal processing industry (iron, aluminium), aquaculture project, overhead power line, desalination plant, free zone development
3. Preparation of Environmental Management Plans (EMP)
a. Drafting of Construction and Operation Environmental Management Plans (CEMP/OEMP)
b. Preparation of EMP for projects in Oman, Qatar and Sierra Leone, for the following activities: oil and gas exploration, desalination plant
4. Technical Studies and Other Activities
a. Disposal study for low toxicity synthetic based mud and cuttings, oil offshore drilling project in Oman
b. Support to environmental monitoring reports for onshore oil exploration and production activities
c. Preparation of onshore oil exploration drilling close-out reports
d. Drafting of a sea turtle management plan for a port development in Nigeria
-
Qatargas (Doha, Qatar)
- Senior Environmental Engineer
2012 - 2013
Senior Environmental Engineer – Environmental Affairs Division – Qatargas Operating Company Limited (Qatargas - the largest Liquefied Natural Gas (LNG) producer in the world ) – Ras Laffan Industrial City, Qatar
1. Environmental Support Lead for the Laffan Refinery (one of the largest condensate refineries in the world) and the Ras Laffan Terminal Operations (liquid hydrocarbon product tank farms and related facilities)
a. Regulatory Liaison: Preparation, submission and follow-up with the Ministry of Environment (MoE) of the annual Consent to Operate (the operating permits in Qatar) renewal applications; Communication and regular meetings with the MoE on environmental matters and initiatives (e.g. air emissions compliance action plans, flaring allowances, wastewater recycle and reuse project)
b. Internal and External Reporting: Preparation and submission to the MoE of the quarterly Environmental Management Plan reports, including air emissions calculations, wastewater discharges and waste inventories; Preparation of weekly and monthly flaring inventory reports
c. Operational Support: Daily environmental support to Operations on environmental monitoring (air emissions, noise, groundwater), wastewater treatment and discharge, waste management, environmental audits, environmental incidents (e.g. spills); Monthly presentations and updates on environmental matters and KPIs to the Asset Leadership Teams; Management of environmental budget and contracts; Maintenance and annual updates of the Environmental Management System documents, including environmental procedures, aspects & impacts registers, legal compliance registers, and environmental objectives & targets; Preparation of the Environmental Management Plan for the major shutdown scheduled at the Laffan Refinery in 2014
d. Projects: Coordination of an Air Dispersion Modelling Study for fugitive emissions during loading of hydrocarbon products; Coordination of implementation of a Storage Tanks Emissions Inventory software for the liquid hydrocarbon product tanks; Support to the Leak Detection and Repair program for piping equipment
2. Environmental Support Lead for the Qatargas ongoing projects, including Jetty Boil-Off Gas Recovery Project, Laffan Refinery 2 and Diesel Hydrotreating Project
a. Support to regulatory processes and approvals with the MoE: preparation and review of Environmental Impact Assessment studies, Construction / Operation Environmental Management Plans, Consent to Construct and Consent to Operate applications
b. Facilitation of communication and organization of meetings with the MoE on environmental matters
c. Preparation of Environmental Operations Readiness Plans
d. Participation in HSE audits of EPC contractors during construction
e. Review of environmental sections of projects’ documents at each stage of the project (feasibility study, FEED, EPC)
3. Environmental Project Lead for the implementation of an Environmental Data Management System (EDMS) for Qatargas
a. Coordination of tendering process
b. Project Preparation: definition of objectives, scope clarification, strategy of implementation, project plan, liaison with the internal project stakeholders from various departments
c. Organization and coordination with the consultant’s team and the internal project stakeholders of the Business Blueprint Phase: workshops, face-to-face interviews and documents review in order to assess the needs in terms of environmental reporting and data management and determine how the EDMS solution can be configured to meet these needs
4. Other Tasks
a. Support to the CSR Department for annual CSR reporting and development of the Sustainability Report 2012, for which Qatargas received an award from Qatar Petroleum (QP)
b. Preparation of presentations on energy and resource conservation in Qatargas’ offices and residential properties
c. Preparation of articles / presentations for conferences, events, awards
d. Participation in QP Environment Fair
-
Environmental Resources Management (Abu Dhabi, Emirats Arabes Unis)
- Environmental Consultant
2010 - 2012
1. Sustainability Reporting Support for Qatargas, Qatar, 2011
- Gap analysis with requirements of the Global Reporting Initiative (GRI) and IPIECA reporting guidelines;
- Design and delivery of a workshop on sustainability and reporting;
- Development of a sustainability data collection questionnaire;
- Sustainability data collection and review for calendar year 2010 through questionnaires and interviews;
- Writing and design of Qatargas Sustainability Report 2010.
2. Sustainability Support for Borouge (petrochemicals company of the ADNOC Group), UAE, 2010-2011
- Benchmark study of peer petrochemicals companies on sustainability management;
- Interviews of Borouge key representatives to understand perception and identify expectations in terms of sustainability management;
- Development of presentation materials on sustainability and delivery of presentation to Borouge Leadership Teams;
- Update of Borouge Corporate Sustainability Framework;
- Sustainability data collection and review for calendar year 2010 through questionnaires and interviews;
- Completion of the ‘ADNOC Sustainability Letter’ for submission to the Supreme Petroleum Council through the dedicated IT platform;
- Writing of the Borouge Sustainability Report 2010 according to the Global Reporting Initiative (GRI) and IPIECA reporting guidelines;
- Participation in Borouge Water Footprint Program.
3. Sustainability Reporting Support for Abu Dhabi National Oil Company (ADNOC) Supreme Petroleum Council (SPC – the regulatory body of ADNOC), UAE, 2011
- Update of the sustainability reporting protocol;
- Organization and delivery of gap analysis meetings, data assurance audits and workshops on sustainability and reporting for ADNOC Group Companies;
- Review of sustainability data reported by ADNOC Group Companies;
- Writing of the Sustainability Report according to Global Reporting Initiative GRI G3 and IPIECA standards.
4. HSE Procedures Development for the Abu Dhabi Gas Development Company (ADNOC company in charge of the Shah Gas field development), UAE, 2010-2011
- Development of HSE corporate procedures on audits and assurance, control of records, incident investigation, non-conformances, management review, performance monitoring, competency assurance, management of change;
- Drafting of a HSE Legal Register ;
- Development of the ‘ADNOC Sustainability Letter’ Delivery Procedure.
5. HSSE Standards Development for Danagas (Middle-East based natural gas company), UAE, 2011
- Development of HSSE Standards (e.g. review and audits, management of change, HSSE investigations), including training pack, audit protocol and gap assessment tool;
- Development of a gap assessment tool for the Operating Risk Management System.
6. Development of an Operations Management Framework for Mubadala Oil & Gas (MOG), UAE, 2010-2011
- Drafting of the Operations Framework (OF) Manual;
- Development of HSSE (Health, Safety, Security and Environment) Standards;
- Update of the Operations and HSSE Policy.
7. Phase I environmental, health and safety (EHS) due diligence in the oil & gas, plastics, and packaging industries
- Desktop review of site records, historical usage, EHS baseline conditions and regulatory requirements;
- Site visit and interview of key personnel from the site and the local authorities;
- Qualitative risk assessment identifying and assessing EHS risks, liabilities and uncertainties associated with the site;
- Drafting of a report detailing the Phase I EHS due diligence process and its key findings.
8. Project coordination and management of junior consultants on various assignments
-
KPMG S.A.
- Auditeur Senior Environnement & Développement Durable (Paris, France)
Courbevoie
2006 - 2010
Audit et conseil en environnement et développement durable - KPMG S.A.
1. Vérification des données environnementales et sociales des sociétés du CAC40 (Veolia Environnement, EDF, Total, Vallourec, Vinci, Air France, Vivendi):
- Données auditées: émissions de gaz à effet de serre et autres émissions atmosphériques, consommation d'eau et d'énergie, rejets d'eaux usées, déchets, données santé et sécurité, données sociales;
- Revue du processus de reporting par le biais d’entretiens avec les Directions Développement Durable aux niveaux Groupe et divisions;
- Planification et réalisation d’audits sur sites, en France et à l’international (Etats-Unis, Grande-Bretagne, Brésil, Hong-Kong, Australie, Pays-Bas, Allemagne, Turquie, Europe de l'Est);
- Revue de la consolidation des données aux différents paliers;
- Emission d’une attestation de vérification publiée dans les rapports annuels.
2. Vérification des émissions de gaz à effet de serre de sites industriels dans le cadre du marché européen des quotas (EU Emissions Trading Scheme - EU-ETS):
- Formation externe pour devenir auditeur EU-ETS certifié (reçu avec un score de 100% au test final);
- Audits sur sites industriels pour Vinci et Vallourec.
3. Missions de conseil en reporting et stratégie EHS (Environnement, Hygiène, Sécurité) et développement durable:
- Optimisation du processus de reporting EHS;
- Élaboration des procédures de reporting environnemental et social;
- Rédaction de rapports développement durable;
- Élaboration d’un plan de formation au développement durable.
4. Réalisation de due diligence environnementale - secteurs de la métallurgie, du papier, de la laiterie et de la logistique.
5. Revue des provisions environnementales inscrites dans les comptes des sociétés - secteurs de l’énergie, de la chimie et de la métallurgie.
6. Etablissement du Bilan Carbone de KPMG S.A. selon la méthode de l’ADEME: détermination du périmètre de reporting, collecte, analyse et consolidation des données, présentation des résultats au Comité de Pilotage, élaboration d'un plan d'actions pour réduire l'empreinte carbone.
7. Réalisation d’études annuelles de benchmark sur la communication des entreprises en terme de développement durable.
-
ISWA
- Projet de fin d'études (Stuttgart, Allemagne)
2005 - 2006
Projet de fin d'études de 8 mois (octobre 2005 - juin 2006)réalisé au sein d'un Institut universitaire traitant de problématiques liées à l'eau et aux déchets, à l'Université de Stuttgart en Allemagne.
Intitulé du projet : Traitement par filtration membranaire d'eaux usées de nettoyage issues de l'industrie laitière.
Travail réalisé : recherche bibliographique, campagnes de mesures sur site, conduites d'expériences en laboratoire, rédaction d'un rapport de synthèse en allemand.
-
Pechiney MMA
- Assistant Responsable Environnement, Santé et Sécurité (Mohammedia, Maroc)
Paris
2004 - 2005
Volontariat International en Entreprise chez Pechiney MMA (groupe ALCAN) à Mohammedia au Maroc.
Poste occupé : Assistant Responsable Environnement, Santé et Sécurité.
Mission : Mise en place d'un système de management de l'environnement sur le site de production d'emballages flexibles et d'articles de ménage de Mohammedia.
Objectif : obtention de la certification ISO 14001.
Travail réalisé :
- Analyse des risques environnementaux et sécurité, élaboration de plans d’action
- Mise en place d’un système de gestion documentaire, rédaction de procédures
- Formation des employés, communication interne et externe
- Actions sur le terrain : tri des déchets, réduction de la consommation d’eau, mise en place de systèmes de sécurité sur les équipements de production, etc.
-
Robert Bosch GmbH
- Stagiaire (Stuttgart, Allemagne)
Saint Ouen Cedex
2002 - 2002
Stage de 2 mois chez Robert Bosch GmbH, au sein du Département de Recherche Energie.
Intitulé de la mission : Simulation avec Visual Basic du comportement d'une installation à cellules combustibles pour systèmes énergétiques de maisons individuelles.