Two-year traineeship program designed to develop future operations managers.
This fantastic program combines
- on-the-job experiencein areas such as Cigarette and Tobacco Production, Quality Assurance, Industrial Project Engineering, Factory supply chain
- formal training and
- career development guidance.
- Short term assigments in other European factories
http://www.pmi.com
BioMerieux
- Process Improvement Engineer – Project Manager
MARCY-L'ETOILE2008 - 2009bioMérieux AUSTRALIA Pty. Ltd. - Brisbane, AUSTRALIA
in vitro diagnostics supplies
10 suppliers - AUD 200k$
Industrialization of a biomedical manufacturing plant (11 million units/yr)
• Industrialized the manufacturing plant: reorganized the flows, re-designed the plant layout and added automation
• Optimized existing systems: developed effective work practices, harmonized production processes (reduction of labour cost), improved the production equipment performance (+ 20%), improved clean room air treatment system (+15%)
• Improved the product: aspect and extension of the shelf life
• Reduced production costs: eliminated non-value added tasks, reduced packaging and labelling cost (- 10%)
• Improved safety: improved material handling and eliminated the root causes of repetitive motions injuries
• “Mastermind behind production improvements” recognition of effort and initiative by Country and Operations Manager
http://www.biomerieux-diagnostics.com
RENAULT TRUCKS / AB VOLVO GROUP
- Industrial Transfer Engineer – Project Manager
2007 - 2007RENAULT TRUCKS - Lyon, FRANCE - Yaroslavl, RUSSIA
International Cooperation Department
4 persons - 1 500 k€
Transfer of industrial equipment from France to Russia (66 workstations - dCi11 truck engine assembly line)
• Drafted and implemented the industrial equipment cession contract
• Organized and supervised the disassembly and transfer of the industrial equipment (27 road convoys)
• Assisted the Russian customer in the re-assembly and start up of the equipment (October 16th 2007)
http://www.renault-trucks.com/
Volvo Powertrain, VOLVO TRUCKS / AB VOLVO GROUP
- Process Improvement Engineer – Project Manager
Creation of a new workshop (specific gearboxes for All Wheel Drive trucks)
• Defined and set up a new workshop in terms of technical, logistical, organizational and human capacities: assembly of 25 units per week.
Quality improvement of a gearboxes assembly workshop (200 units/day)
• Integrated a computer system validation (traceability and assembly): production failure rate divided by 5 (target at 1‰).
http://www.volvo.com/trucks/global/en-gb/home.htm
GALERIES LAFAYETTE
- Process Improvement Engineer - Logistics (trainee)