Blagnac 2013 - maintenantResponsible to achieve on time / cost / quality :
- Engine related for projects for all Tiger versions
- future Tiger upgrade
Activities :
- Project definition and organisation (WBS, planning, cost) consistently with
programme requirements**
- Transversal management of all stakeholders of engine project (Technical
experts, configuration management, airworthiness, Support, Production,
Supplier and Offical services)**
- Contract management
- Change management** ;
- Follow up (EVM, ...) and reporting
- Technical offer preparation
Eurocopter
- Engine Integration Work Package manager
2010 - 2013Engine integration on a newly developped Helicopter project **
- RFI Management** ;
- RFP Management for Turbomeca engine (technical specifications, Statement
of Work, Penalties, Intellectual Property Rights)**
- Contract documentation analysis ;
- Development management ** ;
- performances, cost, planning convergence** ;
- V&V plan : specifications validation, verification plan
On time, on cost, on quality achievement of design milestones (PDR / CDR) both
internally and with Engine Manufacturer ,
EUROCOPTER
- Amélioration R&D
2007 - 2010
PSA Peugeot Citroën
- Stage Support Projets
Rueil Malmaison2006 - 2006- Concevoir et implémenter des méthodes et des outils de pilotage au service des équipes projets
- Concevoir une "boite à outils" structurée permettant de capitaliser les bonnes pratiques
Roland Berger Strategy Consultants
- Stage Consultant Junior
Paris2005 - 2005Réalisation d’analyses au cours de plusieurs projets :
- Réduction de coûts pour un distributeur automobile (15% réduction de frais fixes)
- Audit et amélioration du SI pour une entreprise du secteur nucléaire
Thales Airborne System
- Stage Directions Achats
Courbevoie2004 - 2004-Réduction du panel fournisseurs au sein des différentes familles d’achats
-Audit interne sur le déploiement de « best practices » achats