Mes compétences :
Image processing
Intégration
Matlab
Microsoft Project
Planning
Processing
Entreprises
Alten
Boulogne-Billancourtmaintenant
Inergy Automotive Systems
- Product Application Engineer
lyon2010 - 2010Inergy Automotive Systems is a joint Venture between Plastic Omnium & Solvay SA, supplier of complete plastic fluid storage technologies.
Working on Selective Catalytic Reduction Systems for the German Carmakers
- Support technically the Project Manager and Core Team (Quality, Purchasing, Sales and Industrial Process)
- Coordinate component specialists, CAD Designers, laboratory and prototype teams
- Define and validate the Design
- Control development costs and timing
- Manage prototypes production and deliveries
ACOEM
- Project Manager
LIMONEST2010 - maintenant
Airbus UK (MIGSO Contractor)
- Program Manager Officer
2008 - 2010- Support the Work Package Leader by bringing together the Airbus teams (Engineering, Manufacturing, Procurement, Airline Operation) and the Risk Sharing Partners (Tier one suppliers), applying the GRAMS methodology
- Create and animate the Project Planning (with Microsoft Project, OPX2)
- Configuration Management: deploy and animate the change process (using ICC tool)
- Monitor the Frontier, Interface, Installation Drawings release (understanding of DECIMO, IRMAT, PRIMES, PDMLink tools)
- Manage the interdependencies with Structure teams (Ribs, Covers, Spars, Pylon) and the System teams (xxRD, Fuel, Inerting, FQMS, Test Rig)
- Monitor the Risks (using Airmis) & the Costs (using OPX2)
Solystic SAS - Northrop Grumman Group (Alten Contractor)
- Validation and Test Engineer
2006 - 2008- Integration of a prototype machine ordered by the Deutsche Post.
- First step of the project in Solystic factory: Created functional verification specifications, performed validation tasks, produced validation test reports, diagnosed failures (with IBM ClearQuest software), controlled software configuration versions
- Second Step of the project in Deutsche Post sorting center, Nuremberg, Germany: Organized the activities on site; coordinated communication between internal departments, sub-contractors and customer; created and animated the weekly planning (team of 10 Engineers and Technicians, working in 3 shifts)
Visapix GmbH
- Research and Development Software Engineer
2005 - 2006- Realized a state of the art study in the field of Camera Calibration (Computer vision, Epipolar Geometry, 3D reconstruction techniques)
- Proposed Camera Calibration Methods adapted to the specific used cases (real time applications, video surveillance camera, customer environments)
- Developed the chosen algorithms with Matlab
Formations
Technische Universität Berlin (Berlin)
Berlin2005 - 2006Telecommunication / Signal Processing