-
Bombardier Transportation
- System engineer for railway signaling systems
Crespin
2009 - maintenant
Bombardier transportation - Signaling division
Spain (Madrid): 3 years - USA (Pittsburgh): 1 year - UK (London): 1 year
# CBTC Projects
+ Madrid Metro - Lines 1 & 6
+ Sao Paulo - Line 5
+ London - Sub Surface Railway
# Performance engineering - leadership of a small team
- migration of Bombardier product functionalities into customer railway simulation tool
- management of customer performance requirements
- realization of performance signalling design and evaluation of system performance
- realization of system calibration
# System design - Wayside & onboard ATC, control center
- Developing system level requirements from customer specifications and other documents
- Developing and managing interface requirements
- Leading internal and external design reviews
- Performing traffic simulations for metro systems (headway, regulation)
- Optimizing Bombardier signaling layout to improve headway times
- Preparing technical white papers for external administrations
# Responsible for the knowledge transfer of the CBTC map system from Pittsburgh (USA) to Madrid (Spain): technical knowledge, life cycle and change management, configuration and documentation processes, scheduling and management, tools,...
# Realization of traffic studies for various bid offers including, the Stockholm rail project, CBTC Santiago Chili rail project along with the Amsterdam rail project and Sao Paulo project.
CBTC (Communication Based Train Control) is an automated control system for railway that ensures safe operation of vehicles using data communication between various control entities that make up a system.
-
Capgemini Consulting
- Consultant
Paris
2008 - 2008
Mission de conseil effectuée pendant 6 mois pour Alstom Transport, entité Turnkey Global Solutions.
Objectif de la mission :
- Fiabiliser le management des projets des projets ferroviaires clé-en-main.
Réalisations :
- Formalisation de 3 plans de gestion de projet couvrant l'ensemble de l'offre proposée par l'entitée TGS: Plan de Management de Projet, Plan de Management de l'Ingénierie et Plan de Qualité de Projet
-¬ Organisation et animation d'interviews / séminaires de travail et de sessions de validation du travail avec le client
-¬ Définition, récupération et consolidation des informations
-¬ Consignation en anglais des 3 documents
-
PSA Peugeot Citroën
- Assistant ingénieur
Rueil Malmaison
2006 - 2006
Mission de 6 semaines chez PSA Peugeot Citroen, site d'Aulnay-Sous-Bois (93)
- En charge du contrôle qualité de l’aspect des C2 et C3 à l’atelier Peinture
- Optimisation du nombre de véhicules circulant sur les lignes de production au niveau de la zone de contrôle qualité visuel de l’atelier peinture
-
Thales
- Technicien
Courbevoie
2004 - 2004
Mission de 5 semaines chez Thales, site de Vélizy-Villacoublay (94)
- Vérification de la qualité de calculateurs électroniques pour l’Airbus A380 et réparation
- Elaboration d’un guide d’instructions concernant la réalisation de tests des calculateurs