FIELD ENGINEER OFFSHORE SPECIALISED ON DEPLOYMENT OF OIL AND GAS FIELDS AND DEEP WATER PIPELAYING
Engineer graduated of the Institute of Engineering Sciences of Toulon Var (ISITV) in Advanced Marine Engineering for offshore and onshore sectors
Work experience details
From Nov-13 To Today: - - Client : PETROBRAS
- Position: FIELD ENGINEER OFFSHORE
- Job Description: P55 SCR Project (RONCADOR Field, Module 3/4, Offshore Brazil) (On going)
1. 21-off anchoring piles / 5-off initiation piles.
2. Ultra Deep Water (1800m) installation of 11-off 4km 8’’ production Steel Catenary Risers / 2-off 6km 10'' WI SCRs / 3-off 4km gas and oil export SCRs , all with flow line ending terminations (FLET) at initiation.
3. 16-off spools installation. AKER/FMC technologies
From Feb-13 To Nov. 13 : - Client : Husky Oil - CNOOC
- Position: FIELD ENGINEER OFFSHORE
- Job Description: LIWAN Phase II (LIWAN 3-1 Field, Block 29/26, Offshore People Republic of China)
1. 1-off mudmat / 2-off umbilical electric connector foundations / 4-off manifolds suction piles installation / 1-off bent mudmat recovery from seabed / 7-off counteracts / 3-off concrete mattresses / Spool supports.
2. Deep Water (1400m) Pipelaying of 2-off 3km 4.5’’ lines / 1-off 600m 6’’ line / 4-off 3.5km 12'' CLAD lines, all with production line ending terminations (PLET) on both sides (+1-off skirted anchor on each 12'' flowline). Recovery of 6’’ line both sides for PLET installation and laydown. Pipelaying of 8km 12'' CS line.
3.Recovery of 1-off 22'' line and pipelaying of 13km from 200m to 320m WD.
4.8-off jumpers and 13-off spools installation. Cameron technology with vertical and horizontal CVC tool use.
From Dec-12 to Feb-13: Client: SNEPCO
- Position: FIELD ENGINEER OFFSHORE
- Job Description: BONGA North West (BONGA Field, OML 118, Offshore Nigeria)
1. 1-off Water Injection flowline system :
One 12.75" OD rigid flowline with two water injection flowline termination assemblies and one in-line tee assembly ;
2. 4-off LBMS (sleepers) installation
3. 3-off Production flowlines systems :
Three insulated pipe in pipe (10.36” x 12.75” PIP) flowlines each ended by two production flowline termination assemblies (PFTA) (i.e. a total of 6 PFTA).
From Sep-12 to Dec-12: -Client: CHEVRON’s CABGOC (Cabinda Gulf Oil Company)
- Position: INSTALLATION ENGINEER - Traditional Offshore Methods Department, SAIPEM S.A., France
- Job Description: MAFUMEIRA Sul Pipelines (MAFUMEIRA Field, Block 0, Offshore Angola)
Collaboration on Mafumeira Sul Pipelines Project. Installation studies for 70 km of pipelines near Angolan coasts in shallow waters.
Experience: Mooring, Catenaries calculations, pipelaying process, mooring process.
From Mar-12 to Sep-12: -Client: TOTAL E&P Nigeria Ltd
- Position: Final Internship in Traditional Offshore Methods Department, SAIPEM S.A., France.
- Job Description: HLV Saipem S3000 – S7000 Involvement in the engineering project OFON 2 (installation of two jackets and three modules). Feasibility studies for Anguille Redevelopment Project on AGMP platform.
Experience: Selection of installation aids, Purchase, Calculation of load balancing, Sketches of lifts, check/update of installation plans, Installation methods engineering.
Mes compétences :
Offshore installation
Rigging preparation and calculation
Subsea operations
Offshore field development
Pipelaying
Heavy lift
Matlab
Microsoft Office
R&D
Microsoft Word
Microsoft PowerPoint
Microsoft Excel
Microsoft Access
Languages Skills
HTML
FORTRAN
DEPLOYMENT OF OIL AND GAS FIELDS
C++
C Programming Language
BASIC
Autodesk Inventor
Autocad