-
Saipem
- Senior Offshore Installation Engineer
Montigny-le-Bretonneux
2017 - maintenant
Project: Zohr extension, Egypt - for Petrobel - Flexibles and Umbilicals installation with Saipem S3000 (WD = 1600 mtrs )
Responsabilities:
- Revise Design engineering documents to be in line with installation
- Revise installation Analysis documents to be in line with installation
- Provide installation procedure, checklist manual, Rigging databook for:
- Umbilicals installation
- Flexibles installation
-
Saipem
- Senior Offshore Installation Engineer
Montigny-le-Bretonneux
2016 - 2017
Project: Zohr, Egypt - for Petrobel - Rigid pipeline and Umbilicals installation with FDS (WD = 1600 mtrs )
Responsabilities:
- Revise Design engineering documents to be in line with installation
- Revise installation Analysis documents to be in line with installation
- Provide installation procedure, checklist manual, Rigging databook for:
- Dead Man Anchor installation and recovery
- Pipeline initiation, Quad Joint fabrication, normal laying, Laydown
- Infield Umbilicals Installation
- Go onboard FDS for 6-off Infield Umbilicals installation, SDU mudmats, HIPPS mudmats
-
Saipem
- Senior Offshore Installation Engineer
Montigny-le-Bretonneux
2014 - 2016
Project: Lula Norte & Extremo Sul, Brazil- for Petrobrás- FSHR (Hybrid Riser) installation with FDS2 (WD = 2200 mtrs )
Responsabilities:
- Provide installation solutions for all scope of FSHR (including Buoyancy tank installation, docking, deballasting)
- Revise Design engineering and Installation Analysis
- Provide installation procedure, checklist manual, Rigging databook for Foundation pile and ballast installation; Quad Joint Fabrication in Firing line; String construction procedure in J-Lay Tower; Deployment and transfer; Monitoring System Installation; SIT
- Go onboard FDS2 for FSHR installation for Presalt project
Project: FPSO Firenze offloading hose recovery, Italy- for ENI - Recovery with S3000.
Responsabilities:
- Provide Installation procedure for FPSO hose recovery
- Go onboard FPSO to find a solution for hose disconnection
- Go onboard S3000 Vessel and FPSO to supervise disconnection of the offloading hose from FPSO and recovery onboard S3000
-
SAIPEM SA
- Senior Offshore Installation Engineer
Montigny-le-Bretonneux
2013 - 2014
Project: Burullus phase IXa, Egypt- Umbilicals installation with Normand Cutter
Responsibilities:
- Provide/revise Umbilicals installation and pull-in into J-tube procedures and drawings
- Provide/revise rigging drawings and rigging data book
- Provide offshore installation checklists
- Provide assistance to Analysis&Design team
- Participate to Hazid meeting (Perform installation procedure presentation to Client)
- Witness FAT tests in supplier factories
- Participate to offshore installation campaign (onboard Installation vessel Normand Cutter)
Device installed onboard Normand Cutter as Installation Engineer:
- Umbilicals Loadout (Transpooling in Rosyth),
- Umbilicals pulling into Platform J-tube
-
Saipem
- Senior Offshore Installation Engineer
Montigny-le-Bretonneux
2013 - 2013
Projects(bid phase): Lula Norte&Extremo Sul (for Petrobras, Brazil); Rosebank (for Chevron, Faroe-Shetland channel), Peregrino phase II (for Petrobras, Brazil); Jangkrik (For ENI, Indonesia);
Responsibilities:
- Provide/revise installation method statement/procedures and drawings
- Provide offshore installation campaign schedule, including WOW and vessel MBD analysis
- Control/revise installation work compliance with project/company specification (technical, safety)
- Provide flexible packing analysis
- Provide/revise stacking analysis, transportation plan
- Provide assistance to design team
- Provide assistance to commercial/estimating team
- Participate to bid meetings (pre-closure meetings…)
Scope of work:
- Installation of FSHRs, Flowlines, Jumpers, Flexibles, umbilicals, risers, SSIVs, Manifolds
-
SAIPEM SA
- Senior Field Engineer Offshore
Montigny-le-Bretonneux
2012 - 2013
Projects:
WASIT Project ( Saudi Arabia, for SAUDI ARAMCO)
Long Term Agreement, LTA project ( Saudi Arabia, for SAUDI ARAMCO)
Vessel:
CASTORO 2 (Derrick S-Lay Barge: Shallow-water)
Devices installed on Castoro 2 as Field Engineer Offshore:
- Marjan 430/436 jacket (Water depth: 47m (LAT), Weight: 830mT)
- Marjan 26/28 jacket (Water depth: 47.3m (LAT), Weight: 833mT)
- Abu Safah 81/89,98 jacket (Water depth: 32.1m (LAT), Weight: 634mT)
- S-lay 2x10'' MEG lines
Rotation:
2 months onboard
1 month vacation
1 month at the office in Sharjah (United arab Emirates)
My role onboard:
- Supervise and control if Jacket is installed as per procedure and Aramco contract specifications ( Seam orientation for foundation piles, survey values in acceptable range,...)
- Check survey calculation for Boatlandings elevation, transition pieces orientation, final cut off and Jacket tilt.
- Provide lifting plan and Check all devices before lifting and during installation (fill up and sign checklists with client)
- Provide AUTOCAD drawings and basic engineering structure studies/ solutions concerning steel works needed onboard
- Provide various technical reports concerning tests, issues, solutions on different subjects onboard
- Provide daily progress report and flash reports concerning the different activities onboard
- Provide daily work planning
Training attented:
- Subsea pipelines courses by Jee (4 days)
- Welding courses (4 days)
- rigging courses (1day)
-
SAIPEM SA
- FIELD ENGINEER OFFSHORE
Montigny-le-Bretonneux
2010 - 2012
Projects:
- KIZOMBA SATELLITES (Angola, for EXXON MOBIL)
- USAN (Nigeria, for TOTAL)
- Dry Dock (Cape Town, South Africa)
Vessel:
SAIPEM FDS (Field Development Ship: J-lay Pipelay & crane Vessel: Deep-water)
Devices installed on FDS as Field Engineer Offshore:
- Production Pipe-in-Pipe lines with ITP/sleeves technologies
- Production Sliding Pipe-in-Pipe lines
- SHR risers with buoyancy tank & flexible jumpers
- Water injection lines
- DMA, FLET, PLET, ILT
- Suction Piles
- Manifolds
My role onboard:
- Supervise on deck preparation for subsea installation (Rigging…)
- Check all devices before lifting and during subsea installation (fill up and sign checklists with client)
- Control pipelines before laying as per procedure (Anode, pipes, …)
- Provide Calculation for pipeline laying like cut of Length
- Assist technically Superintendent for underwater Installation and pipeline laying procedures
- Provide AUTOCAD drawings and basic engineering structure studies/ solutions concerning steel works needed onboard
- Provide various technical reports concerning tests, issues, solutions on different subjects onboard
- Provide daily progress report and flash reports concerning the different activities onboard
- Provide MS project planning, Minutes of meeting, daily work planning
Rotation:
2 months onboard
1 month vacation
1 month at the office in Paris (France)
Training attended:
- Extended introduction Hydrography (Offshore Surveying) by Skilltrade: 5 days
-
SAIPEM SA
- Trainee, Inspection, Procurement
Montigny-le-Bretonneux
2010 - 2010
Projects:
-KIZOMBA SATELLITES (Angola, for EXXON MOBIL)
- USAN (Nigeria, for TOTAL)
My missions:
Responsible for standard Inspection Schedule on Offshore projects (Nigeria, Angola)
Over a 6 months period, I was attached to the offshore inspection department, procurement. My mission was to create Standard Inspection Data Sheets (IDS) - which correspond to standard inspection schedules for each material/ equipment incorporated and no incorporated - and implement these new documents on the projects USAN, KIZOMBA SAT and USARI.
- create Standard Inspection Data Sheets (IDS) and implement these new documents on the projects USAN, KIZOMBA SAT and USARI.
- Provide Presentation to the engineers and managers on the IDS concerning why we need it, what it is, how to use it (inspection levels choice …).
- Call inspectors to manage and report problems on site/workshop/yards
- Invent a system to estimate the inspection budget at the invitation to tender step
- Provide thesis about management system/process of inspection department.
-
University of Florida
- Trainee, Civil and Coastal Engineering Dpt
2009 - 2009
Over a 9 weeks period, I successfully integrated myself into the University Research team to provide them with an operational tool for modeling wave dissipation in muddy Environment in the Atchafalaya Bay, Gulf of Mexico.
- had field data in 3 points into the sea, a bathymetry, and some documents about sea muddy environment.
-Developed in autonomy a working knowledge of the SWAN software, found the best Inputs for SWAN and analyzed correctly the outputs.
-Contributed to the understanding of wave dissipation in muddy environment, essential for the prediction and effects from Hurricane Katrina.
-
METEO FRANCE
- Trainee
Saint Mandé
2007 - 2008
During this 6- week training period, I worked on a formula in order to predict a river flood (The Brenne).
- Had a climatology database (manipulated with Microsoft Access),
- Discovered a formula which can foresee the rate of flow, and consequently, the Brenne flood (with a negligible error), 12 hours before flooding.
-Allows local companies to have enough time to protect themselves against the flooding.