  • GEOCEAN - Lead Project engineer

    2010 - maintenant Lead project engineer, GEOCEAN - Koniambo Project (New Caledonia)

    Duration: 12 months

    Client: Hatch & Technip

    Project view:
    Manufacturing and laying of a HDPE Outfall pipeline 710mm diameter and 6.5 km long from landfall to 60m depth. This pipeline will be a part of the Koniambo nickel plant cooling system situated in the North Province of New Caledonia.

    My job:
    Qualification of our technical and material needs in collaboration with the various actors of the project during the preliminary period; management of the installation and construction engineering; coordination of the works during project operation.
  • GEOCEAN - Project engineer

    2009 - maintenant Project engineer, GEOCEAN - TERGA Project (Algeria)

    Duration: 6 mois.

    Client: Orascom-Alstom

    Project view:
    Procurement, engineering and laying of five 2m diameter and 750m long water intake HDPE pipes from landfall to intake head structures located at 20m depth. This project was a part of the new TERGA power plant 1200 MW.

    My job:
    In charge of the design of five steel-made intake head, follow-up of the construction progress during head manufacturing, writing of pipe and intake heads laying procedures, coordination of the operations on site.
  • GEOCEAN - Field engineer

    2009 - maintenant Field engineer, GEOCEAN - SONARA Project (Cameroun)

    Duration: 3 months

    Client: Société nationale de raffinage (SO.NA.RA), national refining company

    Project view:
    Renewal of the Limbé (Cameroun) oil refinery jetty. Cutting back of two damaged dolphin piles and laying of five new ones: hammering, drilling and concreting operations performed from a Jackup barge especially equipped for big diameter piles installation.

    My job:
    In charge of the supervision and coordination between all subcontractors regarding the operations, reporting of daily operation events to the project management team.
  • GEOCEAN - Engineer

    2008 - maintenant Study engineer, GEOCEAN - Fouka Project (Algeria)

    Duration: 6 month

    Client: SNC LAVALIN.

    Project view:
    Design of two different pipes:1,6m diameter and 1000m long water inake HDPE pipes from landfall to intake head structure located at 25m depth, 1,2m diameter and 600m long Outfall HDPE pipe from landfall to the diffuser structure at 15m depth

    My job:
    In charge of the design engineering regarding the project scope of work: realization of the hydraulics, structures and hydrodynamic (stability) calculation notes and the laying engineering in collaboration with the client and the contractor in charge of the operation.