Menu

Nicolas REVERCHON

Blagnac

En résumé

AERONAUTICS
Reliability, Availability, Maintainability and Safety
MSG-3 (definition of scheduled maintenance program)

Entreprises

  • Airbus Helicopters - MSG-3 Team Manager

    Blagnac 2012 - maintenant Team manager in charge of MSG-3 analyses (definition of scheduled maintenance program) for systems embedded on EC175:
    - Production of MSI (Maintenance Significant Item) analyses, SSI (Structural Significant Item) analyses and zonal analyses according to the Airbus Helicopters policy and procedure handbook,
    - Close collaboration with system design responsibles and maintenance responsibles to validate MSG-3 analyses and define the initial minimum scheduled maintenance (MRBR),
    - Participation to working group with regulatory airworthiness authorities for analyses approval.
    - Activity follow-up (quality, costs, planning, performance) and team management
  • Airbus Helicopters - FMDS engineer

    Blagnac 2009 - 2012 AIRBUS HELICOPTER (Marignane): Reliability and safety analysis at research and development direction, flight safety and reliability analysis department
    - Achievement of system safety analyses (FHA, SSA, CCA,…) according to aeronautical recommended practices (ARP4754, ARP 4761) and civil regulations (CS29, AC29) for new development and medium/heavy commercial programs,
    - Close collaboration with system design responsibles to develop safe and reliable systems
    - Performing safety reviews at project level,
    - Suppliers follow up for safety and reliability requirements,
    - Participation to MSG-3 maintenance program and master minimum equipment list definition
  • ZODIAC aerospace - FMDS engineer

    Plaisir 2008 - 2009 ZODIAC Aerospace (Plaisir): Reliability and Safety analysis for an equipment embarked on A350
    - Functional Analysis,
    - Preliminary architecture validation (according to ABD100 1.3E),
    - MTBF preliminary assessment (with Milstress),
    - Carrying out of FMEA (with Failmode), FMES and fault trees (with Faultree+),
    - Carrying out of PSSA (Preliminary System Safety Assessment).
  • AIRBUS HELICOPTER - Project engineer

    Blagnac 2008 - 2008 EUROCOPTER (Marignane): ILS offer manager for NH90 and Tiger Program: offers build-up for international governmental customers
    - Customer Request For Quotation analysis
    - Offer perimeter definition with regards to Eurocopter ILS activities
    - ILS stakeholders coordination (LSA, Material Support, Technical Publication, Training, Technical Assistance)
    - Technical perimeter definition and cost estimations synthesis
    - Offer synthesis, reviews and validation
  • IRSN - Project engineer

    Fontenay-aux-Roses 2007 - 2007 IRSN DPAM (Cadarache): Quality Management System improvement
    - Achievement of Project Quality Management Plans (PQMP) for 10 major DPAM project in regards to ISO 9001 and RG AERO 0040
    - Achievement of PQMP instruction guide
    - Achievement and updating of DPAM processus documentation
  • RENAULT Truck Defense - Project engineer

    2007 - 2008 RENAULT Truck Defense (Vélizy): Offer manager for military heavy vehicles program:
    - Design department coordination for technical offer build-up:
    o Technical Data collect
    o Carrying out of technical offer deliverables
    o Offer KPI definition and monitoring
    o Offer planning definition and monitoring

Formations

  • IAE

    Aix En Provence 2005 - 2006
  • Ecole Nationale Supérieure Des Arts Et Métiers (Metz)

    Metz 2001 - 2005

Réseau

Annuaire des membres :