Mes compétences :
Qualité
Management
Ingénierie
Amélioration continue
Aéronautique
Gestion de projet
Entreprises
Pierre Mabillot Consulting for P3 Voith Aerospace
- A350-900/1000 Zone Leader for Airbus (Floor/Unpressurized area in alternance)
2012 - maintenant
Safan Engineering Services (SAFRAN Group)
- Fuselage Engineering Support to Manufacturing
2011 - 2012• Training regarding Engineering vision to Manufacturing EHF/A2D designers
• Communication enhancement between Manufacturing and Engineering
• Improvement of iDCR process
• Experience feedback from Manufacturing to Engineering
• General process improvement
• Issues resolution not to block harness jigboard/2D drawings creation
• Quicker reactivity to give solution based on Engineering statement to support and solve
manufacturing issues given by operators
• Decreasing trend for issues raised by Manufacturing (iDCR)
Paris2011 - 2011• Process definition and installation for 929 deliveries workflow
• Communication with CIRCE-I team to understand requested rework
• Rework management
• Discrepancies analysis and management
• Interface management with international partners (Germany, UK)
• Consistency checks, analysis and deliveries to CIRCE-I team
• Communication with Manufacturing
• Support and training to 929 designers
• iDCR (internal Design Correction Request) management
Paris2010 - 2011• DQN analysis to define Root Cause and find best solution for resolution
• Concession analysis to define Root Cause and find best solution for resolution
• Participation to ICB tri-weekly meeting for official decision in accordance with Airbus
• Process communication definition between French and German sections
• Support for installation to French blue collar regarding German definition in junction area
• DMU analysis regarding encountered problems
• DQN/Concession answer through SAP
• Experience feedback from MAP Harness Installation to Engineering
• Communication improvement
Safran Engineering Services (SAFRAN Group)
- Engineering Support to Manufacturing
Paris2010 - 2010• Support to blue collar and Design Office in MCA level
• 929 Drawing-DMU-Jigboards correlation checks for best solution decision
• Action to raise DQN and/or synchronize teams around problems to find best solution
• Communication improvement
• Communication enhancement between Engineering and Manufacturing
• Airbus-Labinal Change Plan starting for Project 2.4
• Installation synchronization preparation
Paris2009 - 2010• Participation to Airbus-Labinal Change Plan (Projects 2.2, 2.4, 2.6)
• Validation for “new rules to be applied” with Airbus
• KPIs checks (SSCI/UIDs/DMU-I) and new cluster definition for fair discussion with Airbus
• New affairs analysis for proposal to Airbus
• Internal SSCI process definition for Labinal design improvement
• Training and support to designer
• OPL raising to secure and remind requirements
Safran Engineering Services (SAFRAN Group)
- Electrical Team Leader
Paris2007 - 2009• Training and support to designer
• Checks (TDD/SIDP) and Deliveries
• Teamboards
• Planning Reporting
• Configuration Management
• OPL raising to secure and remind requirements
• Participation to process and tools definition
• Datas and people management
• TRS fulfilement
Safran Engineering Services (SAFRAN Group)
- Electrical Team Leader
Paris2006 - 2007• Training and support to designer
• Checks (TDD/SIDP) and Deliveries
• Teamboards
• Planning Reporting
• Configuration Management
• OPL raising to secure and remind requirements
• Participation to process and tools definition
• Datas and people management
• TRS fulfilement
ECM for Labinal (SAFRAN Group)
- Leader/Designer for Electrical Installations
2004 - 2006• Planning/Reporting
• Electrical Design respecting TDD/SIDP
• DQN incorporation management
• Clash incorporation management
• Checks (TDD/SIDP) and Deliveries
• Configuration Management
• Support and training to designers
• Process improvements
• TRS fulfilement
ECM for Labinal (SAFRAN Group)
- Designer for Electrical Installations
2003 - 2004• Electrical Design respecting TDD/SIDP
• Complete electrical installation definition in DMU for a whole given harness
• MP3 harness installation (customized harness for CCC)
• "Litiges" : Impacted Drawing Management fulfilement based on MP validity
• DQN incorporation
• Fixed bracket request and Structure approval management
• Use of ACE environment
ECM for Labinal (SAFRAN Group)
- Designer ATA53
2003 - 2003• ATA92 fixed bracket request incorporation on Primary and Secondary Structure
• Secondary structure modification according to Airbus requirement
• Airbus process and ACE environment learning