Menu

Ségolène LEPEUVE

Paris

En résumé

Se réunir est un début, rester ensemble est un progrès, travailler ensemble est la réussite. Henry Ford

Mes compétences :
Microsoft PowerPoint
Microsoft Office
AutoCAD
Capitol V9
SolidWorks
Planisware
MSProject

Entreprises

  • General Electric - QA/QC Supervisor, Control and preparer

    Paris 2019 - maintenant EPR de Flamanville (Nuclear Power Plant 1x1650MW), France

    EDG (Emergency Diesel Generators) / TEU-TEP (Waste and radioactive water treatment plants)

    • Supervision, coordination and planification of site works
    • Responsible for the preparation of ITPs, and their follow-up and application during works
    • Responsible for customer’s hold points clearance before start of works
    • Review of erection files, checking of their conformity and the completeness of associates certificates prior to their integration into SWCF
    • Management of non-conformity and Punch Items raised during internal walkdowns and inspection by the Owner (redaction, follow-up, proposal of solutions and clearance)
    • Ensure the conformity of the corrective actions with regards to applicable standards
    • Driving the weekly meetings with the Owner, subcontractors and other interfaces
    • Support to erection supervisors et participation to internal walkdowns
    • Proposals for continuous improvement with regards to costs, quality and lead times
    • Redaction of quality procedures, verification of their correct application at site
    • Redaction of inspection reports, derogations request, etc..
    • Management of calibration of instrumentation for controls (follow-up, preventive and corrective actions)
    • Application and respect of EHS and Quality rules

    Tools: MTA, SAP Powermax
  • Areva - Business Manager Valves Team

    Paris La Defense 2018 - 2018 EPR de Flamanville, France Nuclear Island

    ➢ Responsible for the management of activities in accordance with the planning and the contractual milestones

    ➢ Application and improvement of the existing process for Open Points (OP) management via OMPS
    • Preparation of the work to be achieved for clearance of OPs
    • Ensure that the OPs clearance progress guarantees the commissioning schedule
    • Evaluate each open point with regards to the need in engineering, procurement and
    erection to prepare the execution of activities (pre-execution file, execution conditions on site, ...)

    ➢ During erection activities
    • Execute the OP clearance process with links with the preparation teams and site teams
    • Ensure the prioritizing of the subcontractors’ activities with regards to the critical path
    of the planning
    • Ensure feasibility in terms of engineering, procurement preparation, scaffolding, access
    and co activities
    • Preparation of scaffolding activities, erection works, interfaces, etc.
    • Coordination of on-site execution with the package managers
    • Coordination with the commissioning team for equipment turnovers
    • Perform the administrative closure of OP


    Software: OMPS (FRAMATOME proprietary tool)
  • Vulcain Ingénierie - Project Manager

    NEUILLY SUR SEINE 2018 - maintenant
  • Asco - Planner/ Work manager

    Lognes 2018 - 2018 CNPE de Flamanville 1-2 (2x1300 MW Nuclear power plant), France Nuclear Island


    ➢ Management of the planning during the outage of Flamanville 1
    ➢ Works manager of the HVAC erection inside and outside the controlled area
    ➢ Ensure that the works are perform in accordance with schedule, specifications, permit to work
    and guarantee the EHS compliance
    ➢ Conventional waste management
    ➢ Team manager of 40 people

    Software: Planisware, MSproject
  • SEC-INGENIERIE - Draft designer

    2017 - 2017 Engineering Office in Montebourg (50)


    ➢ Project: electrical network for the wind-and-water tight of a construction

    ➢ Analysis of customers’ needs
    • Study of the client specifications and the request of the project manager
    • Coordination with the different companies interfacing with the project for gathering
    the drawings and necessary inputs
    • Study and quantification (BoM) of the different elements necessary for the wind-and-
    water tight
    • Measurements and check of the drawings on the construction site

    ➢ Designer of the electrical network (CAD)
    • Design the general arrangement drawing of the network
    • Perform the CAD of the detailed design
    • Send the drawings to the client for validation

    ➢ Preparation for the works
    • Establish the request for the planning permission

    Software: CAPITOL V9
  • Construction - Personnal Construction Project

    2016 - 2018 ➢ Foreman/ Supervisor of the works

    • Coordination and supervision of 5 different profession (masonry, plumbing, electricity,
    roofing, carpentry) of 45-50 people
    • Management of construction meetings
    • Cost-control, negotiation with craftsmen and choice of materials
    • Establishment of specifications
    • Drafting of the contracts with the different interfaces (example: contractual clause for
    liquidated damages for delays)
    • Design of the different documents (layout, network,...)

    ➢ Administrative activities

    • Application for a grant from the Regional Directorate for Cultural Affairs (DRAC) and
    the Heritage Foundation
    • Request to collective organizations (authorization of work with the town hall, request
    to the urbanism and the roadworks, or departmental council)

    Software: Pack Office, Autocad 2D
  • SCP DELECROIX GUBLIN - Assistante Juridique

    2008 - 2008
  • INSEAD - Library Assitant

    Fontainebleau 2005 - 2005 Stagiaire

Formations

Réseau

Annuaire des membres :