Huawei Technologies Co. LTD
- Software and Application Engineer
Boulogne Billancourt
2010 - maintenant
Network Planning
• Line of Sight
• Hardware and Software Installation and Commissioning
• Operations and Maintenance
• Technical Support
• Network Operations Center Management
Projects:
- Huawei SMC (Installation, Configuration and Maintenance)
- Huawei IP Call Center (Installation, Configuration and Maintenance)
- Huawei RBT (Installation, Configuration and Maintenance)
- Huawei WAP GW (Installation, Configuration and Maintenance)
- Huawei MMC, IPTV and SDP (Installation, Configuration and Maintenance).
Sotelma Malitel Project Turnkey 2009: SMC, URP8100, OCS, VMS
Role:
• Hardware installation
• Software and Application deployment
• Commissioning and debugging
• IP Network planning
• Switch, Router and Firewall configuration
• Maintenance.
• Configuration and commissioning of URP for OCS, IPCC, and RBT
• Configuration and commissioning of USAU for SMC, and OCS product.
Tools:
• Eclipse, NetBean, MGC Operation and Maintenance Center, MGW Maintenance Center, PL/SQL,
Database and OS:
• Oracle 11g, Informix, Linux SuSe 10, HP Unix.
Details:
• This project was principally divided into 3 phases:
• Hardware installation and software pre-installation
• Debugging and commissioning
• And the maintenance.
• My main tasks were:
• Supervise the hardware installation, OS and Software installation and commissioning, and my main products were SMC, URP1800, and IP Network configuration (Switch, routers and firewall) those parts of the project were my responsibilities during that big project.
Orange Mali RBT Project (Phase I, maintenance and Extension): HP Servers (Windows 2000 Servers), disk array S3300, URP6600, Files Server Suse 10, CTI and USDP, Oracle 11g.
Role: RBT Expert
• Deployment, commissioning and maintenance Lead
• Supervise hardware installation
• Maintenance and Technical support
• Network Planning
• Line of Sight
• Switch, Router and Firewall configuration (Huawei E200, S5300 and AR20)
• Hardware and Software Installation and Commissioning
• Operations and Maintenance
• Technical Support
• Network Operations Center Management
• Troubleshooting
• Huawei disk Array 2300E and S3300 configuration
Tools:
• Eclipse, NetBean, MGC Operation and Maintenance Center, MGW Maintenance Center, PL/SQL,
Database and OS:
• Oracle 11g, Windows 2000 Advanced Server.
Details:
• This is the Huawei Call Ring Back Tone system based on Windows.
• Software installation, commissioning and debugging of USDP, CTI, URP, and all the others component of RBT system.
• CTI
• USDP
• URP
• Files Servers
• The disk array (storage) we used Huawei S3300 disk array.
• Configuration of URP6600, the files servers
• Testing and get the PAT (Preliminary Acceptance test)
• Switch, Router and Firewall configuration (Huawei E200, S5300 and AR20)
Sotelma Malitel IP Call Center: IPCC (RBT): ATAE (Suse 10), USM, Huawei 2300E disk array, URP 1800, files servers, Oracle 11g.
Role:
• Deployment, commissioning and maintenance Lead
• Supervise hardware installation
• Maintenance and Technical support
Tools:
• Eclipse, NetBean, MGC Operation and Maintenance Center, MGW Maintenance Center, PL/SQL,
Database and OS:
• Oracle 11g, Linux SuSe 10.
Details:
• The IPCC and RBT are the same they have the same component and I managed this two products from the beginning (getting the materials from the warehouse) to end (getting the PAT ) and be the lead maintenance Engineer for more than one year.
• This is the Huawei IP Call Center system based on Linux Suse 10 with 50 agents.
• Software installation, commissioning and debugging of USDP, CTI, URP6600, and all the others component of RBT system.
Sotelma Malitel PS Project: SDP, MMSC, WapGW: ATAE USM, Suse
Role:
• Deployment, commissioning and maintenance Lead
• Supervise hardware installation
• Maintenance and Technical support
Tools:
• Eclipse, NetBean, MGC Operation and Maintenance Center, MGW Maintenance Center, PL/SQL,
Database and OS:
• Oracle 11g, Linux SuSe 10.
Details:
• This project is the PS project, a