Menu

Thibaut HUET

EYGALIERES

En résumé

Abilities:
- Project organisation and leadership
- Management
- Autonomy
- Be entreprising

Technical Knowledges:
Mechanic, hydraulic, pneumatic, electricity, automatisms, piping, welding, sheet metalwork, metallic structure, Eurocode, Greenhouse norms...

Field Knowledges:
- VENLO greenhouse project
- Pneumatic transportation process
- Glass Manufacturing
- Medical manufacturing
- Concrete manufacturing
- Quality
- Maintenance
- Production organisation

Languages:
French: Mother Tongue.
English: Fluent.
Chinese: Simple discussion

Computer skills:
MS project, File Maker Pro, Pack office, Autocad, Solidworks, SAP, GMAO, PDCA

Mes compétences :
qualité
produits
leadership
autonomy
maintenance
engineer
production
optimisation
responsable

Entreprises

  • Richel Group - Chef de projet VENLO

    EYGALIERES 2017 - maintenant Projets de bâtiments: serre en verre de type VENLO:
    • En 2018 gestion de 10 projets complet, un total de 30 M€ de Chiffres d’affaires.
    • Depuis l’expression du besoin, assurer la gestion de l’avant-projet, des projets, de la réalisation, du suivi du montage, et suivis du service après-vente. Gestion des projets dans leurs globalités et particulièrement sur la charpente.
    • Assurer le développement de la gamme VENLO. Mise en place d’un processus projet au sein de l’entreprise. Structuration du corps de métier VENLO.
  • Axens - Project Manager

    Rueil-Malmaison 2017 - 2017 Projets d’investissements travaux neufs et réaménagement.
    • A partir de l’expression du besoin : FEL1, FEL2, FEL3, Réalisation, Intégration.
    • Portefeuille projets de 1,3M€.
  • NEU Process - Project Manager

    2014 - 2016 Design et réalisation de Process de Transport Aéraulique.
    • Projets depuis l'enregistrement du contrat jusqu'à la fin de la période de garantie. Plan technique: choix de solutions, dimensionnement. Plan commercial: relation client et fournisseurs, suivi du budget et des délais. Coordination des différents prestataires internes et externes. Management transversal des collaborateurs.
    • Process de transport Aéraulique pour un site pétrochimique au Turkménistan. Budget >3M€. 60 prestataires. 10 personnes. Durée : 15 mois.
    • Revamping d’une installation Pétrochimique au Qatar. budget >3M€. 20 prestataires. 5 personnes. Durée 6 mois.
    • Implantation d’une station de vidange Big bag pour un site alimentaire au Vietnam
  • Guardian Glass Company; C.R.V.C - Project engineer

    2011 - 2014 Project engineer for "Centre de Recherche pour le Verre et la Céramique"
    in Guardian Glass Company

    Currently on 3 project:
    - New float glass plant in Russia
    - 2 Float glass plant cold rebuilt in Europe
  • Meditechlab / (East china) - Production and maintenance Chief Manager

    2008 - 2011 Activities: on the customer’s worksite. Setup a dialyzers production line. Supervise and increase production efficiency, direct management, team manager, operational project leader, workers training.

    Production: in one year, increase the productivity of 280%, from 1700 to 5000 unit per day.
    - Organized the production process.
    - Management and production monitoring (production schedules, stock management…)
    - Performance improvement: training, 5S…

    Quality: waste reducing from 5% to 1%
    - Setup PDCA methods, working group, projects management, internal audit.

    Maintenance: Reduce machine downtime of 30% whether 5h/week
    - Machine improvement, oversee maintenance operations.
  • TARMAC UK / Wolverhampton (internship) - Research and devellopment center

    2007 - 2007 Research, Translation and tailoring of a metrological standard control for asphalt strength test machine.
    - Asphalt standard mixing design, test and introduction in test process.
    - Setup a machine test process.
    - Train the laboratory technician.
  • TARMAC France (Hecquet Factory, Harnes/ Apprenticship) - Production engineer

    2005 - 2008 Subject: Concrete block press vibrating analysis. The aim was to improve the vibration during process.
    - Press vibration process analysis completed by stroboscopic and thermal analysis.
    - Theoretical analysis: Mould and vibrating system establishment of a model.
    - Setting up the improvement: maintenance team management for the press, the vibration and organizational improvement. Design of specifications for suppliers.

Formations

Réseau