Ortec Group
- Pipeline/ Piping Construction Supervisor
Aix-en-Provence
2017 - maintenant
GHANA OCTP Development Project
Client: ENI
Position: Pipeline/ Piping Construction Supervisor
Description of the project:
A new conversion double hull/double balcony FPSO unit will be installed above the main oil and no associated gas reservoirs inside the OCTP Development and Production Areas, at about 60 km from shoreline, and it will be controlled and operated by the OCTP.
The FPSO unit is expected to treat all crude oil and associated gas (to be re-injected for reservoir pressure support) produced from the OCTP license.
NAG (Non Associated, high calorific value Gas) is planned to be sent onshore by means of a new 63 km long sea line (currently anticipated to be 26''OD - 20''ID) then to the slug catcher or receiving separator to manage any liquid slugs from the sea line due to pigging or transient operations.
Sale gas to be compressed at the ORF at the pressure required by the Ghana national grid, then measured using a fiscal metering unit in accordance with Authorities requirements and finally sent to the national gas grid.
-
Omv
- Pipeline Construction Supervisor
Paris
2015 - 2017
Oil Field Development Project
Client: OMV
Position: Pipeline Construction Supervisor
Description of the project:
-Nawara Project Pipeline
-Preparation, Installation & Welding (Automatic and manual welding) of 365 Km of 24'' pipeline from CPF Borma to CPF Gabes.
- Check all steps of Pipe line fabrication, (ROW, Stringing, Trenching, crossing works, bending, welding, lowering and backfilling, Hydrostatic testing & Coating)
-
MedcoEnergi
- Construction site manager
2015 - 2015
-Installation of Gathering System to connect 11 productions well with the Early Production Facilities as phase I.
- Preparation, Installation & welding of 20 km of pipe line of different diameter (8”; 10”; 12” & 14” with different class of thickness STD & 80)
- Check all steps of Pipe line fabrication, (ROW, Stringing, Trenching, crossing works, bending, welding, lowering and backfilling, Hydrostatic testing & Coating)
- Installation of four new Storage Tank of 5000 BBL
-Construction & Installation of three fire fighting Tank
- Construction & Installation of Sludge catcher, Water injection Tank, Drain Tank.
- Construction of new evaporation pit for produced water 82m x 66m (civil work)
- Installation of a flare system
- Truck loading station waiting
- Pipe line of 150km to transport oil to Zarzis port as phase II.
-
MARETAP
- Construction superintendant
2015 - 2015
-Removing old bottom and floating roof
-Installation of new bottom plate 2520 square meter.
-Painting Inside and Outside
-Installation of new floating roof (10 T) with Ultra Float Company; US.
-
Serept
- Construction supervisor
Hammam Lif
2013 - 2013
Description of the project:
Offshore Platforms:
- Installation of big structural modules in loose parts, which received a ``Strand Jack'' used for the big lifting & installation of an electrical room (45Tons) from a barge with sea fastening collapsible supports and
-Installation of a new HVAC unit & cooling system
-Pre-commissioning assistance:
* Assigning and witnessing pre commissioning activities for flushing, blowing, lube oil Systems flushing, chemical cleaning/pickling of process lines of compressors, leak test etc.... ;
* Planning and scheduling of activities in collaboration with construction contractor designate personnel, estimation of manpower, equipments and materials necessary for each activity. ;
Assure technical assistance for commissioning and start-up of units on request of client.
-
SEREPT
- Construction Superivisor
Hammam Lif
2012 - 2015
off shore management
Manage contracts
Remarkable experience in residential construction project management
Huge knowledge of construction and field engineering
Proficient with construction and project management.
Ability to coordinate with varied groups of individuals
Ability to track and monitor construction progress through site reports
Manage and facilitate several interfaces (eg, between Operations and Construction,onshore/offshore)
Managed construction activities and formulated major construction equipment list.
Safety coordination ( weekly meeting)
Logistics coordination with on shore people
Daily reports for site manager
Weekly report for top management
-
SEREPT
- Area site representatif
Hammam Lif
2011 - 2012
on shore management
manage contract and contractors
responsible for the construction phase of new modules for platform extension
logistics and materials coordination with procurement people
follow progress
daily and weekly reports for construction managemen
-
SEREPT
- Construction supervisor
Hammam Lif
2010 - 2011
off shore management
Outlined accurate construction schedules.
Bargained and issued purchase orders.
Managed quality control and safety & compliance.
Handled interviewing employees and subs.
mechanical work
decommissioning and dismantling of a turbo generator
installation of a new LP gas compressor
piping installation and connetion
hydrostatic test
installation of 2 new electrical rooms(mechanical)
cable tray and cable installation
commissioning
-
SEREPT
- Construction supervisor
Hammam Lif
2010 - 2010
contracts study and verification
preparation of construction files
preparation of job cards
Reviewed layouts with field engineers.
Aided superiors in planning construction processes.
logistics coordination
-
PIRECO
- Quality Control Inspector
Les Berges du Lac
2007 - 2010
material control
Record test data, applying quality control procedures.
welding inspection, NDT inspection , WPS preparation, performing welders qualification
test pack preparation ,supervise and perform hydrotest
pipe installation as per DRWG and PID's
pre commissioning and commissioning punch list elaboration