Conducteur travaux
Supervision de chantier
Tuyauterie industrielle toute nuance d'acier
Communication avec les personnels
Inspection et contrôle permanent
Management
FPSO
Oil Field Development
Welding
Offshore Platform
commissioning assistance
Gas Processing
Gathering Systems
Installation
LPG
Project Management
Remarkable experience
Stainless steel
Water Treatment
design
residential construction project management
Autocad
Microsoft Office
Test Planning

Entreprises

  • Ortec Group - Pipeline/ Piping Construction Supervisor

    Aix-en-Provence 2017 - maintenant GHANA OCTP Development Project
    Client: ENI
    Position: Pipeline/ Piping Construction Supervisor
    Description of the project:
    A new conversion double hull/double balcony FPSO unit will be installed above the main oil and no associated gas reservoirs inside the OCTP Development and Production Areas, at about 60 km from shoreline, and it will be controlled and operated by the OCTP.
    The FPSO unit is expected to treat all crude oil and associated gas (to be re-injected for reservoir pressure support) produced from the OCTP license.
    NAG (Non Associated, high calorific value Gas) is planned to be sent onshore by means of a new 63 km long sea line (currently anticipated to be 26''OD - 20''ID) then to the slug catcher or receiving separator to manage any liquid slugs from the sea line due to pigging or transient operations.
    Sale gas to be compressed at the ORF at the pressure required by the Ghana national grid, then measured using a fiscal metering unit in accordance with Authorities requirements and finally sent to the national gas grid.
  • Omv - Pipeline Construction Supervisor

    Paris 2015 - 2017 Oil Field Development Project
    Client: OMV
    Position: Pipeline Construction Supervisor
    Description of the project:
    -Nawara Project Pipeline
    -Preparation, Installation & Welding (Automatic and manual welding) of 365 Km of 24'' pipeline from CPF Borma to CPF Gabes.
    - Check all steps of Pipe line fabrication, (ROW, Stringing, Trenching, crossing works, bending, welding, lowering and backfilling, Hydrostatic testing & Coating)
  • MedcoEnergi - Construction site manager

    2015 - 2015 -Installation of Gathering System to connect 11 productions well with the Early Production Facilities as phase I.
    - Preparation, Installation & welding of 20 km of pipe line of different diameter (8”; 10”; 12” & 14” with different class of thickness STD & 80)
    - Check all steps of Pipe line fabrication, (ROW, Stringing, Trenching, crossing works, bending, welding, lowering and backfilling, Hydrostatic testing & Coating)
    - Installation of four new Storage Tank of 5000 BBL
    -Construction & Installation of three fire fighting Tank
    - Construction & Installation of Sludge catcher, Water injection Tank, Drain Tank.
    - Construction of new evaporation pit for produced water 82m x 66m (civil work)
    - Installation of a flare system
    - Truck loading station waiting
    - Pipe line of 150km to transport oil to Zarzis port as phase II.
  • MARETAP - Construction superintendant

    2015 - 2015 -Removing old bottom and floating roof
    -Installation of new bottom plate 2520 square meter.
    -Painting Inside and Outside
    -Installation of new floating roof (10 T) with Ultra Float Company; US.
  • Serept - Construction supervisor

    Hammam Lif 2013 - 2013 Description of the project:
    Offshore Platforms:
    - Installation of big structural modules in loose parts, which received a ``Strand Jack'' used for the big lifting & installation of an electrical room (45Tons) from a barge with sea fastening collapsible supports and
    -Installation of a new HVAC unit & cooling system
    -Pre-commissioning assistance:
    * Assigning and witnessing pre commissioning activities for flushing, blowing, lube oil Systems flushing, chemical cleaning/pickling of process lines of compressors, leak test etc.... ;
    * Planning and scheduling of activities in collaboration with construction contractor designate personnel, estimation of manpower, equipments and materials necessary for each activity. ;
    Assure technical assistance for commissioning and start-up of units on request of client.
  • SEREPT - Construction Superivisor

    Hammam Lif 2012 - 2015 off shore management
    Manage contracts
    Remarkable experience in residential construction project management
    Huge knowledge of construction and field engineering
    Proficient with construction and project management.
    Ability to coordinate with varied groups of individuals
    Ability to track and monitor construction progress through site reports
    Manage and facilitate several interfaces (eg, between Operations and Construction,onshore/offshore)
    Managed construction activities and formulated major construction equipment list.
    Safety coordination ( weekly meeting)
    Logistics coordination with on shore people
    Daily reports for site manager
    Weekly report for top management
  • SEREPT - Area site representatif

    Hammam Lif 2011 - 2012 on shore management
    manage contract and contractors
    responsible for the construction phase of new modules for platform extension
    logistics and materials coordination with procurement people
    follow progress
    daily and weekly reports for construction managemen
  • SEREPT - Construction supervisor

    Hammam Lif 2010 - 2011 off shore management
    Outlined accurate construction schedules.
    Bargained and issued purchase orders.
    Managed quality control and safety & compliance.
    Handled interviewing employees and subs.
    mechanical work
    decommissioning and dismantling of a turbo generator
    installation of a new LP gas compressor
    piping installation and connetion
    hydrostatic test
    installation of 2 new electrical rooms(mechanical)
    cable tray and cable installation
    commissioning
  • SEREPT - Construction supervisor

    Hammam Lif 2010 - 2010 contracts study and verification
    preparation of construction files
    preparation of job cards
    Reviewed layouts with field engineers.
    Aided superiors in planning construction processes.
    logistics coordination
  • PIRECO - Quality Control Inspector

    Les Berges du Lac 2007 - 2010 material control
    Record test data, applying quality control procedures.
    welding inspection, NDT inspection , WPS preparation, performing welders qualification
    test pack preparation ,supervise and perform hydrotest
    pipe installation as per DRWG and PID's
    pre commissioning and commissioning punch list elaboration

Formations

  • Institut Internationale De Soudage (France)

    France 2008 - 2009 technologue international en soudage

    IWT - préparation WPS
    connaissance de différents procédés de soudage
    connaissance de différent procédés de controle destructif et non destructif des assemblages soudés
    calcul RDM
    calcul fond bombé des réservoirs
  • Institut De Soudure Industrie

    Paris Nord 2008 - 2009 level 2
  • Faculté Des Sciences De Sfax fss (Sfax)

    Sfax 2001 - 2006 maitrise
  • Faculté Des Sciences De Sfax (Sfax)

    Sfax 2000 - 2006 Master of Science

    Applied sciences University Industrial Chemistry, Metallurgy, Master (MSc/MA)
    - June 2001college sfax, Tunisia
    Sciences, Bachelor (BSc/BA)

Réseau

Annuaire des membres :