Mes compétences :
Project management
Process Engineering
Cost and manufacture
Entreprises
BMW
- Ingénieur Industrialisation / Process Planner
Munich2011 - 2015Industrialization from module and high-voltage battery production and test for the 3rd generation (UKL; F30; 35up)
From Investment estimations to start of production; Supplier management with quality, budget and schedule target.
• Process analyze for subsidiary BMW Peugeot Citroën Electrification. BMW – PSA; specification comparison.
• Request for investment; tender book; specifications; request for quotation. Define assumption and target.
• Supplier analyzes adjustment and compare; Price negotiation.
• Layout design; cardboard simulation management
• Milestones and schedule management
• Investment estimations: new plant, production line, process changes
• Process- und product design
• Maturity validation for every prototype sample (Hardware process day)
• MTM2 analyze; line balancing.
• Supplier studies control and validation; supplier management (PDCA cycle)
• Product characteristics and quality specifications defining and validation
• Process FMEA, control plan
• IT Concept preparation and testing (SAP-Line; IPS-C; IPM)
• First product production on the line at the supplier management; pre-acceptance
• Set-up to handover management.
• End of line test specifying, preparation and control
• Process and measuring equipment capability control. Measuring system analyze.
Tools: Measure Time Method, Value stream mapping, WPS, PDCA,
Fertinagro
- Ingenieur Industrialisation
Genève2010 - 2011Ingénieur Industrialisation
Amélioration de cadence de ligne de production (management production et maintenance)
Rédaction de cahier des charges, consultation de fournisseurs, suivi de chantier.
ALSTOM Transport Preston
- Industrialization trainee
2008 - 2008Lay out new workshop area with new jib arm using 5S principles. Implement health and safety improvements.
Creation of build manuals
ALSTOM Transport Tarbes
- Apprenti Ingénieur amélioration continue KAIZEN
2006 - 2009Animation de chantier d’amélioration (KAIZEN), formation et management d’une équipe pluridisciplinaire. Formation et management de stagiaires ENIT.