Co-ordinate inputs from support functions on all commercial aspects of the tender
Ensure the tender meets the client requirements and follows Subsea 7’s guidelines and processes
Issue the commercial proposal to the clients
Subsea seven (ex- Acergy)
- Field Engineer (Ingénieur Chantier Offshore)
2008 - 2011Missions:
Clarification then endorsement of the barge scope of work in term of operational feasibility (including safety aspects)
Ensuring that the logistics organized "around the ship" is adequate and planned with the most efficient way
Ensuring that equipment/assets to be used by the ship are fit for purpose with the adequate level of preparation
Develop & prepare the Standard Operations Procedure
Preparation of the mobilization plan, following on site to ensure that the equipments (internal & subcontractor equipments), the installation aids & the project consumables are onboard.
Issuance of Operation reports complying with the Operations standards
Organization of debriefing meetings on specific topics (lesson learnt)
Projects:
PAZFLOR (TOTAL, Angola):
Follow-up of FPSO Mooring Spread Installation onboard Polaris in Port-Gentil (Gabon)
Update of J-Lay Standard Operations Procedure (friction clamp integration)
Review of the Project Pipelay Installation Procedure
ANGOLA LNG (EXXON, Angola):
Preparation (office and onsite) of Polaris Mooring spread for anchored operations in shallow water
Preparation of Polaris mobilisation in Port-Gentil (Gabon)
FRADE (CHEVRON, Brazil):
Review of the Project Flexible Installation Procedure
Onshore Logistics in Porto Do Forno for Polar Queen vessel (Brazil)
NORNE (STATOIL, Norway):
Study of Jumper installation feasibility by Polar Queen vessel
GJOA (STATOIL, Norway):
Preparation and follow-up of Polar Queen transpooling in NKT factory (Danemark) for three risers
Operations preparation (task plan, Risk Assessments, tensioner setting, rigging preparation)
POLARIS MAINTENANCE & REPAIR (Gabon):
J-Lay Stinger Removal: Onsite Engineering & Operations follow-up to remove the stinger for replacing the roller boxes
Annual S-Lay Tensioner Load Test: Standard Operations Procedure elaboration & follow-up of the load tests onsite
Polaris Mooring Spread Setup: Anchor winch load test preparation & catenary software validation
Others: Order of vessel consumables, follow-up of vessel equipments (calibration)…
L'Oréal Japan
- Project Engineer - Industrial Logistics
PARIS2006 - 2006Set a production continuity plan (disaster recovery plan)
Set a new shipper label in the scope of traceability project
Study of the feasibility of a pull-flow system (Kanban)
Acergy
- Ingénieur Planning
2006 - 2007Missions:
Establish vessel performance report the “as-planned” VS the “as-built”
Explain delta between the “as-planned” VS the “as-built” especially for welding production
Establish standard mechanical breakdown rates (Polaris) for tender purpose