Voyages
- ....en curieux, ou pour travailler
maintenant
Canada : Montreal
USA : New York
UK : Londres, Cambridge
Scotland : Glasgow, Fort William, Dundee, St Andrews, Aberdeen
Portugal : Lisbonne
Grèce : Athènes, Delphes, Ile de Rhodes
Afrique du Sud : Cape Town
Maroc : Essaouira, Marrakech, Moyen Atlas
Mauritanie : Atar, Chinguetti, Nouakchott
Gabon : Port-Gentil
Angola : Luanda, Lobito
Nigeria : Port-Harcourt, Kaduna, Warri, Lagos, Forcados
Nederland : Rotterdam, Schiedam, Dordrecht.
Togo : Lome
Italy : Roma, Ravenna, Trieste, Milano
Poland : Gdansk
Congo : Pointe Noire
Inde : Mumbai, Jaipur, Jaisalmer, Udaipur, Jodpur
Malaisia : Kuala Lumpur, Georgetown.
Singapour
-
Saipem
- Project Operation Manager
Montigny-le-Bretonneux
2013 - maintenant
Kizomba Project : Deep offshore project located in Angola. Installation of new production and water injection flowlines, tie back to existing facilities, installation of jumpers, manifold and umbilicals. Responsible for yard construction and offshore installation.
-
Saipem
- Deputy Project Manager
Montigny-le-Bretonneux
2012 - 2013
Usari phase 2 in Nigeria.
Replacement of Asasa - Edop pipeline
Replacement of Edop - QIT pipeline
Replacement of Ubit - QIT pipeline
including pipe laying, spool, riser and associated precom operations.
-
Saipem
- Operation Manager
Montigny-le-Bretonneux
2010 - 2012
USARI Project - conventional pipe laying for Exxon in Nigeria
NKOSSA Project - Flexible replacement for Total in Congo
ANGUILLE Project - Jacket and Deck transport and installation for Total in Gabon
-
Saipem
- Installation Manager
Montigny-le-Bretonneux
2008 - 2010
Olowi project took place in Gabon and included fabrication, transport and installation of 3 decks of 800t and 3 jackets of 400T. The project also included the laying of 2 systems of pipe lines to link the platorms with the 10" line equipped with a Direct Electrical Heating system (DEH). All platforms were connected to the FPSO with umbilicals and flexibles laid over a mid water arch.
This as been a challenging project from a technical point of view (pipe pulling under FPSO, electrical heating cable laid in piggy back) and from logistical aspect (operation in Gabon from Congo).
-
Saipem
- Subcontract Engineer
Montigny-le-Bretonneux
2007 - 2008
Bid comparison, commercial evaluation, contract award and folllow up for various subcontractors to be mobilised for Awa Paloukou / Ikalou Project in Congo. Subcontractors activities included diving (sat and air), positionning, survey, grouting, precom...
Act as operation engineer in Congo during the operation phase with mob / demob of all subcontractors.
-
Saipem
- Deputy Installation Manager
Montigny-le-Bretonneux
2006 - 2006
Amenam field (Nigeria) Installation of a bridge (657 metric tons) between AMP1 and AMP2, mobilisation of equipment, barge positioning and weather forecast.
-
Acergy
- Field Engineer on Seaway Polaris
2004 - 2006
As Polaris Field Engineer, I have been involved in operational phases of major offshore projects, ensuring that installation procedures are in compliance with barge capabilities, reviewing technical aspects of operations and mobilizing material from our onshore bases. Joining the barge crew for each project, I have supervised various typical offshore operations, assisting Barge Manager in defining the work sequence and making sure that project quality and safety specifications are applied.
Erha field - Nigeria - Laying of Oil OffLoading Line between FPSO and Buoy. Installation of jumpers on drilling center.
Amenam field - Nigeria - Lifting and installation of AMD3 deck.
EAP field - Nigeria - Installation of 3 bridges (max 750 tons). Laying of export line in S-lay mode.
Benguela Belize field –Angola - Installation of 3 jumpers on Compliant Piled Tower.
Amenam field - Nigeria - Installation of 3 lifted risers.
Amenam field - Nigeria - Laying of export lines. Barge mobilization, operation supervision.
Benguela Belize field - Angola - Equipment mobilization from Gabon ; export lines s-lay.
Bonga field - Nigeria - Connection of Steel Catenary Riser to FPSO in J-lay mode.
-
Acergy
- Project Manager
2003 - 2004
Based in Angola and working in relationship with workers and client from various nationalities, I have managed a project of 13 Millions USD, covering procurement and fabrication of 15 suction anchor piles for Kizomba FPSO. Using for the first time a brand new assembly line and coordinating a team of 100 welders, fitters and riggers, we have been able to achieve structures delivery within schedule and budget.
- Development of a new safety culture among workers.
- Contract management, planning and budget reporting.
- Definition of an assembly & welding sequence for the piles fabrication.
- Construction supervision as per EXXONMOBIL specifications.
- Logistic follow up of steel shipped from Europe.
-
Acergy
- Fabrication Engineer
2001 - 2003
I worked on several fabrication projects on Warri yard (Nigeria) and Lobito yard (Angola), acting as a functional link between the project management team based in Europe and the yard. Dealing with welding, quality and safety constraints, I was the single point of contact with the client site representative.
- Fabrication of an 80T manifold with duplex piping for ABB-Coflexip in Angola. Management of a team of 25 workers.
- Fabrication of decks (550 Tons) and jackets for Amenam field, Nigeria. Structural and piping work.
-
Entrepose
- CSNE
1999 - 2001
This cooperation has been an opportunity to acquire a first experience in oil & gas industry and of West Africa. Travelling through the country and auditing projects gave me a glimpse of what managing a project in harsh environment could be.
- Control and regular update of the budget of FTTRP Project (20 millions US $).
- Cost control of logistical bases - Lagos, Warri and Port Harcourt.
- Contract management (300 000 US$ & 50 millions Nairas).