SURESNES2012 - 2014OFON2 Project – TOTAL - Nigeria
SUBSEA 7
- Project Welding & Materials Engineer
SURESNES2011 - 2012• Oct. 2011 to currently:
OFON2 Project – TOTAL - Nigeria
• Jan. 2011: ACERGY becomes SUBSEA7
TOTAL FRANCE, Refinery of Normandy (76)
- Internship
2007 - 2007• Realization of guides for the writing of recommendations on welding (metallurgical aspect and method of operating) and post welding heat treatment (PWHT) for inspection reports.
• Definition of reference specifications (Equipment identification, service conditions, …)
2007 - 2012• Mar. 2010 to Jun. 2011:
OSO RE and Condensate Pipelines Replacement Project – MPN - Nigeria
Issue of technical scope of work (welding + NDT) for suppliers
Review of supplier’s technical offers;
Review of supplier’s documentation (Welding books for offshore CRA welding and onshore CRA fabrication (spools & risers));
Follow of CRA Welding Procedure Qualification (automatic & manual / 5G);
Follow of RT Validation Plan;
Issue of structural welding book & CS/CRA topside piping welding book
Issue of offshore & onshore CRA welder qualification procedures
• Aug. 2008 – Feb. 2010:
Block 15 – Gas gathering – ExxonMobil - Angola
Issue of technical scope of work (welding + NDT) for suppliers
Review of supplier’s technical offers;
Review of supplier’s documentation (Welding books for offshore welding and onshore double jointing fabrication);
Follow of Welding Procedure Qualification (automatic & manual / 5G & 2G);
Follow of AUT qualification Plan;
Purchase of welding equipments and consumables (preheating system, welding generators, gas …);
Technical support to other disciplines on punctual issues;
Follow of offshore operation (Welder qualification and production) – 3 months;
Follow of jumpers’ fabrication on Lobito Yard (SONAMET) – 1 month;
(Supervision of material control, welding and NDT activities, dimensional control and SIT).
Issue of structural welding book for Jacket installation;
Purchase of welding equipments and consumables (SS-FCAW equipments + flux cored wire);
Follow of offshore operation (welding of piles, transition pieces, decks) – 1 month.
Activities Issue of technical scope of work (welding + NDT);
Technical evaluation of suppliers’ offers;
Review of clients’ specifications;
Evaluation of production rates.
• Graduation Engineering Development Scheme (GEDS) program: 18 months induction program for graduate engineers.