Mes compétences :
Management opérationnel
Gestion de projet
Gestion des opérations
Entreprises
Technip Norge
- Specialist Engineer - Installation Department
2012 - maintenant- ASGARD Subsea Compression System Option 5 Project: Interface Coordinator.
- TENDERS: Installation methods development for flexible jumpers, umbilicals and Technical qualifications.
- BALDER Phase III: In charge of SIT and to develop tie-in procedure.
Technip France
- Subsea Operations Engineer
Paris2010 - 2012COGA Project ( Congo Part) I have been responsible for :
- Floatel Vessel and Fast Support Intervention Vessel selection and compliance with client specification.
- Vessels mobilization and execution plan preparation.
- Coordinate and optimize mobilization operation.
- Project Interface with marine department for vessel delivery and readiness.
- Client relationship during mobilisation phase.
TENDERS (Egina UFR, Block 15/06): Operations engineer in charge to select vessels ( Construction Vessel, HLV, Supply,...), interface with assets department.
Technip France
- Planning Group Leader Subsea
Paris2007 - 2010Planning team up to 20 persons, reporting to the Planning Department Head.
- General role as Sponsor: technical support (tools, methods, feedback, cross fertilisation and expertise), orientation and validation when required.
- Participates on Projects or Tenders as necessary ( WDDM Phase 8A).
- Performs as Appraiser the Yearly Performance Appraisals of the Planning Managers.
- Ensures that the Department Methods are applied on projects and tenders, supervises their implementation.
- Promotes the lessons learnt and feed-back.
- Assists the Department Head on the team mobilisations (prepares the subsea planning workload) and the manhours budgets validation on projects and tenders.
- Prepares the weekly updated vessels schedule consolidating the Region A projects and tenders. Reports to the Region A Operations Manager.
Technip France
- Planning Manager
Paris2003 - 2007Planning manager on several project( between 10M$ to 800M$):
- implement the Level 1,2,3 overall schedule
- implement the planning procedures
- manage the planning team on the projects
- prepare and follow the level 4 Offshore Installation Schedule on Subsea Projects