  • Saipem - Lead Offshore Operations engineer (Fano, Italy // Cairo, Egypt)

    Montigny-le-Bretonneux 2013 - maintenant - Procedures review
    - Equipments mobilization
    - Vessel spread (tugs, pipe carriers, Cargo barges...) mobilization
    - Project material procurement (BID, technical evaluation) / IAs Fabrications follow-up
    - Vessel mobilization preparation & follow-up (Equipment/spread/personnel Logistics)
    - Project Representative onboard installation vessel

    PROJECT: Burullus WDDM Ph. IXa development project (EGYPT)
    VESSEL: Saipem S3000
    SCOPE OF WORK:
    - Flexibles Deployment (8"/10"/14,3")
    - Umbilicals deployment (117,5mm OD)
    - Subsea structures deployment (suction piles, modules,...)
    - Rigid pipeline recovery & PLET installation (J-mode)
  • SAIPEM SA - Offshore Field Engineer

    Montigny-le-Bretonneux 2010 - 2013 - Procedures review (problems anticipation and resolution)
    - Operations preparation (task plans, equipment, rigging)
    - Operations coordination/follow-up with shift supervisor
    - Interface between client, project and sub-contractors representatives
    - Technical documentation issuance

    VESSEL: S3000 (rotation 8 weeks on / 4 weeks off)
    PROJECTS:
    - USAN (Total, Nigeria)
    FPSO mooring lines hook-up (6")
    - N'KOSSA (Total, Congo)
    4" Flexible replacement
    Production unit (NKP) mooring chains top part replacement (12-off, 4" 1/2)
    Gas storage vessel (NKSII) mooring chains top part replacement (6-off, 4")

    VESSEL: S230 (rotation 8 weeks on / 4 weeks off)
    PROJECTS:
    - Massongo (Perenco, Cameroun)
    6" / 8" pipeline installation (S-Lay, Zap-Lok)
    - GCO-Mibale (Perenco, DRC)
    6" pipeline installation (S-Lay, Zap-Lok)

    VESSEL: Saipem FDS2 (rotation 8 weeks on / 4 weeks off)
    PROJECTS:
    - LIWAN (Husky, China)
    22'' pipeline installation (J-Lay)

    VESSEL: Saipem FDS (rotation 8 weeks on / 4 weeks off)
    PROJECTS:
    - WDDM Ph.VIII (Burullus, Egypt)
    10" pipeline installation (J-Lay)
    10" Flexible deployment
    4" Umbilical deployment
    Suction piles installation
    Manifolds installation
    Flying leads installation (electrical & hydraulic)
    - KIZOMBA Satellites (Exxon Mobil), Angola
    10'' x 16'' Sliding Pipe in Pipe installation (J-Lay)
    12” Water Injection pipeline installation (J-Lay)
    Suction piles installation
    Production and water injection manifolds installation
    Jumpers installation / recovery
    SHR deployment (rigid pipe-in-pipe and flexible jumper)
    - USAN (Total), Nigeria: Single Hybrid Riser (SHR) campaign
    Riser fabrication (Injections & Productions Pipe in Pipe)
    Flexible jumper deployment
    Buoyancy tank connection
    SHR overboarding, dewatering and docking

    VESSEL: CPLB Crawler (rotation 8 weeks on / 4 weeks off)
    PROJECTS:
    - Critical Crude (Exxon Mobil), Nigeria:
    24''/20''/16'' pipeline installation (S-Lay)
    Bridges installation (associated piles hammering & grouting)
    Spools fabrication / installation
    - USARI-IDOHO (Exxon Mobil), Nigeria:
    24'' pipeline installation (S-Lay)
    - SCP (Total), Angola:
    Gas injection platform hook-up activities
    - Vessel maintenance/upgrade
  • SAIPEM SA - Operation Engineer

    Montigny-le-Bretonneux 2009 - 2010 USAN Project (Total, Nigeria): Offshore campaign preparation (Flowlines & Risers)
    - Procedures review
    - Material/consumables purchase (BID, technical evaluation) / Fabrications follow-up
    - Logistics (vessel mobilization preparation)
  • SAIPEM SA - Project Engineer

    Montigny-le-Bretonneux 2008 - 2009 PLCV 4000 development project:
    PLCV 4000 Dynamic Positioning performances analysis

Formations

  • ENSIETA

    Brest 2006 - 2009 Naval architecture & offshore engineering
  • Lycée Descartes (Tours)

    Tours 2003 - 2006 Engineering school entrance preparation

Réseau

Annuaire des membres :