Menu

Rémy MENU

SCHIEDAM

En résumé

Thirteen years experience in Oil and Gas Industry. Mutlidiscipline knowledge in offshore engineering covering Riser, Mooring and Topside.

Engineering Project Manager for the last 8 years in SBM Offshore and previously acting as pipeline/riser engineer for Doris Engineering (5 years).



Mes compétences :
pipeline
manager
engineer
Gestion de projet
engineering
Management
Ingéniérie

Entreprises

  • SBM Offshore - Engineer Project Manager

    SCHIEDAM 2006 - maintenant Engineer Project Manager on BrownField Project for SHELL
    SBM MALAYSIA:

    EPM for a New Drilling Module of 2 000 tons and new accomodation blocks to be installed offshore Brazil on an existing FPSO
    The engineering covers the following disciplines : Marine and Naval for new accomodation and update of the loading and stability of the FPSO. Safety, Hydro, Structure, Piping, Mechanical, rotating equipment, E&I , Process for the new module and modification onto the existing FPSO Topside.

    2009 – 2012 Engineer Project Manager on a DeepWater Buoy for TOTAL/SAIPEM
    Engineering of a 1 000 tons DeepWater Buoy for the offloading of the a FPSO.
    Main Scope : Anchoring system (Chain connector, Chains, Driven Pile) , Surge pressure and pressure drop calculation, design and supply of the offloading hoses, QCDC, Solar Power System, Telecommunication, HPU, Winches…

    2007 – 2009 Engineer Project Manager for two new Terminals for CHEVRON
    EPM for two Shallow water offloading Terminals and two subsea Pipeline End Manifold (Mooring, Geotechnical, Structure, Pipeline).

    2006 – 2007 Engineer Project Manager
    EPM for a shallow water buoy Overhaul (SHELL)
    Technical Assistance for chain repair and retensionning on a FPSO turret in North Sea (BP)
    Inspection on DeepWater Buoy

    Technical Support for Proposal on DeepWater Buoy and BrownField Project.
  • Doris engineering - Ingénieur Pipeline & Riser

    Paris 2001 - 2006
    2004 - Feb 2006 – Field Architect
    Riser Engineer for TOTAL E&P on the Rosa Project. Responsible of the Saipem Engineering Follow Up for The Hybrid Riser Tower.

    2001 - 2004 – Pipeline-Piping Stress
    Lead Piping stress on a Gravity based Platform DE RUYTER (6 months duration) in north sea.Software used: CAESAR
.
    Lead Pipeline for SISSI NUBI, TAMBORA project (Client: TOTAL). Pipeline routing, expansion analysis, riser analysis, dog leg analysis, upheaval buckling, laying
    Pipeline Engineer on Peciko, Tunu Pipeline Project (TOTAL)

Formations

Réseau

Annuaire des membres :