Subsea 7
- Topsides Package Manager
SURESNES
2012 - maintenant
EPCI project extension of the existing Erha subsea system and infrastructure, which is currently producing to the existing Erha Floating Production, Storage and Offloading vessel (FPSO) located in OML 133 in Nigerian waters (in water depth ranging from 1000 to 1200 m). Responsible for the execution of the work related to Topsides modifications package:
- Coordinate and follow up the execution of all Engineering work at Crestech office (up to 60 personnel)
- Coordinate and follow up Supply Chain activities (10 personnel)
- Coordinate and follow up Fabrication work and Operations
- Control and report budget and schedule
- Identify and ensure management of changes
- Take ownership and manage the Risks and schedule associated to work package scope of work
- Identify and progress external interfaces and link with the Interface Manager
- Coordinate and report to Client counterpart
-
Saipem
- Project Engineer
Montigny-le-Bretonneux
2011 - 2012
EPCI project of subsea structures and tie-back with the existing FPSO BONGA at a water depth of approximately 1200m within block OML 118 offshore the Nigerian coast. Responsibilities within the project:
-Support the Project Manager and the Contract Administration Team for the technical preparation of the plans of execution of Provisional Sums and Extra Work (Fabrication and Offshore Installation).
-
SAIPEM S.A.
- USAN UFR Project – Deputy Flowline Package, Lagos/Port-Harcourt (Nigeria)
Montigny-le-Bretonneux
2010 - 2011
Development of turnkey project of sub sea structures and tie-back with the new
FPSO USAN in order to develop Oligocene type oils at a water depth of
approximately 800m within block OML 138 offshore the Nigerian coast.
Responsibilities within the project
- Follow-up design/installation engineering, procurement, sub-contractors
activities
- Coordinate design/installation engineering, procurement, sub-contractor,
construction activities
- Follow up procurement/sub-contractor activities
- Follow up construction activities performed in Nigeria
- Follow up offshore installation campaign in Nigeria
-
SAIPEM S.A.
- USAN UFR Project – Deputy Flowline Package, Paris office
Montigny-le-Bretonneux
2009 - 2010
Development of turnkey project of sub sea structures and tie-back with the new
FPSO USAN in order to develop Oligocene type oils at a water depth of
approximately 800m within block OML 138 offshore the Nigerian coast.
Responsibilities within the project
- Follow-up design/installation engineering, procurement, sub-contractors
activities
- Coordinate design/installation engineering, procurement, sub-contractor,
construction activities
- Follow up procurement/sub-contractor activities
- Follow up construction activities performed in Nigeria
- Follow up offshore installation campaign preparation
-
SAIPEM S.A.
- AKPO UFR Project – Deputy Umbilical Package/Project Engineer, Offshore (Nigeria)
Montigny-le-Bretonneux
2008 - 2009
Development of turnkey project of sub sea structures and tie-back with the new
FPSO AKPO in order to develop Oligocene type oils at a water depth of
approximately 1400m within block OML 130 offshore the Nigerian coast.
Responsibilities within the project
- In charge of S3000 vessel mobilization for umbilical and spool
installation and FPSO and offloading buoy mooring
- Insure vessel logistic from mobilisation site
- Follow-up umbilical, spools installation
- Follow-up FPSO, offloading buoy mooring activities
- Follow-up Manifolds recovery
- Follow-up Final Documentation Umbilical Package
-
SAIPEM S.A.
- AKPO UFR Project – Deputy Flowline/Umbilical Package, Paris office
Montigny-le-Bretonneux
2007 - 2008
Development of turnkey project of sub sea structures and tie-back with the new
FPSO AKPO in order to develop Oligocene type oils at a water depth of
approximately 1400m within block OML 130 offshore the Nigerian coast.
Responsibilities within the project
- Follow up procurement, sub-contractors, construction activities
- Coordinate procurement, sub-contractors, transport and construction
activities
- Preparation/coordination offshore installation campaign
-
SAIPEM S.A.
- Gas Gathering Project – Project Engineer - Pointe-Noire (CONGO)
Montigny-le-Bretonneux
2007 - 2007
Interconnect the Girassol and Dalia gas injection networks to a common outlet
to export the gas towards Block 2 through a main gas export pipeline.
Responsibilities within the project
- In charge of FDS vessel mobilisation
- Follow-up rigging re-certification, material arrival on mobilisation site
and installation aids fabrication
- Insure vessels logistic from mobilisation site
- Follow-up spools installation on board FDS
- In charge of project demobilisation at Pointe-Noire
-
SAIPEM S.A.
- ROSA SURF Project – Planning Engineer - Luanda (Angola)
Montigny-le-Bretonneux
2006 - 2007
Development of turnkey project of sub sea structures and tie-back with the
existing FPSO Girassol in order to develop Oligocene type oils at a water
depth of approximately 1400m within block 17 offshore the Angolan coast.
Responsibilities within the project
- Established the Project Detailed Installation Schedule based on detailed
plans prepared by installation team
- Schedules Issuance and follow-up of the installation schedule from
Luanda (Angola)
- Prepares progress status with data from Vessels Daily Progress Report
- Consolidate and ensure proper progress status reporting
- Deviations, PROJECT trends & Productivity analysis
-
SAIPEM S.A.
- ROSA SURF Project – Planning Engineer - Paris Office
Montigny-le-Bretonneux
2004 - 2006
Development of turnkey project of sub sea structures and tie-back with the
existing FPSO Girassol in order to develop Oligocene type oils at a water
depth of approximately 1400m within block 17 offshore the Angolan coast.
Responsibilities within the project
- Sets ups, operate a computerized data system which covers WBS,
scheduling and progress reporting
- Established the Project Execution Schedule based on detailed plans
prepared by different departments
- Schedules Issuance and follow-up for different level of the schedule
- Prepares progress status with data carried out by each department
- Consolidate and ensure proper progress status reporting
- Deviations, PROJECT trends & Productivity analysis
-
MI-GSO
- Car development – Planning Engineer
Boulogne-Billancourt
2002 - 2004
Set-up of standard schedule inside 2 departments. Responsibilities within
the project:
- In charge, with departments team, to develop standard schedule for new
car development
- Development of tools to follow the technical progress of project
- Installation of these new project management methods on pilots projects