  • Technip France - Project Manager, Technip

    Paris 2010 - maintenant Jubilee 1A project, Tullow, Ghana, 2012-2013
    Above 200 million USD EPCI contract, team >100 members

    Managed project activities for the supply & installation of 20km of water injection lines, lazy wave flexible riser and associated subsea equipment (PLET, manifold, etc).

    Project Management – Directed project team activities and liaised with client and subcontractors to ensure project progress on schedule and within budget. Ensured timely procurement of materials and construction of components, oversaw manufacturing operations, verified quality process was adequate and correctly implemented.

    ABO5 project, ENI, Nigeria
    Flexible riser repair of gas injection system on the ABO FPSO.

    Montanazo & Lubina, Repsol, Spain
    USD 70 million EPCI contract
    Jacket hook-up, subsea umbilicals, flexible risers, manifold, flying leads, and trenching operations.
  • Technip USA - Lead Engineer Project

    Paris 2008 - 2010 JUBILEE Field Development (Anadarko, Ghana): Jan09 to now
    Responsible for engineering and installation of all rigid lines (production, water injection and gas injection).

    GEAUXPHER umbilical (Mariner Energy, Inc.): Apr 08 to Jan09
    Responsible for engineering and installation of 1off 40 miles umbilical with the pipelay vessel Deep Blue Vertical Lay).
    Responsible for fabrication of installation of ancilleries equipment (subsea mudmat, lifting frame, chutes, etc).

    DORADO umbilical (BP): Feb 08 to July 08
    Actively involved in engineering and installation of 3off umbilicals with the construction vessel Canyon Olympic Triton (Horizontal Lay).
    Participated in offshore execution (5 weeks).
  • Technip USA - Installation Project Specialist

    Paris 2005 - 2008 SHENZI (BHP Billiton): analytical / project engineer (Apr 07 to Feb 08)
    Fully involved in the Shenzi offshore campaigns on the pipelay vessel Deep Blue.
    Followed up of all offshore installation activities in accordance with project specifications and procedures.
    Involved in design of subsea structures.
    Responsible for engineering analyses for rigid pipeline installation. Liaised with client engineering for drilling
    interface. Acted as client’s adviser on analysis/operational/installation issues.

    CASCADE (PETROBAS) / NEPTUNE (BHP): analytical engineer (Jan06 to Feb07)
    Performed installation analyses using Orcaflex for Cascade Packages A, B and D and Neptune flowlines and risers. Specification and design of rigid pipelines. Participated in offshore execution (6 weeks).
  • ExxonMobil - Assistant Energy Coordinator

    Notre-Dame de Gravenchon 2004 - 2005